Difference between revisions of "EGI-InSPIRE:MS108 GOCDB"
(Created page with '{{Template:Assessment header}} {{Template:Notes To Contributors}} {{Template:Assessment_Template |O_Task_number = # |O_Task_name = Configuration repository |O_Task_assessment = …') |
|||
Line 5: | Line 5: | ||
|O_Task_number = # | |O_Task_number = # | ||
|O_Task_name = Configuration repository | |O_Task_name = Configuration repository | ||
|O_Task_assessment = | |O_Task_assessment = under construction (11/03/2011) | ||
|O_Task_score = write here | |O_Task_score = write here | ||
|O_Task_howtoimprove = | |O_Task_howtoimprove = under construction (11/03/2011) | ||
| | | | ||
| | | |
Revision as of 13:55, 11 March 2011
Notes to contributors
Assessment: (Provide an assessment of the delivery of services over the past year from a managerial perspective; highlight positive areas and areas for improvement; do not include future plans; text should be roughly 1-2 paragraphs)
Score: (assign a numerical score from 1 to 5 with a succinct explanation of what needs to be improved to increase your score – remove numerical description references upon completion) 1 = An unacceptable level of service was delivered
2 = A level of service that was below expectations was delivered
3 = An acceptable service level has been delivered
4 = A level of service that exceeded expectations was delivered, but there is scope for even further improvement
5 = An excellent service has been delivered that should be considered as best practice
# | Name | Assessment | Score | How to Improve |
---|---|---|---|---|
# | Configuration repository | under construction (11/03/2011) | write here | under construction (11/03/2011) |