Difference between revisions of "EGI-InSPIRE:Jra2 2014-06-25"
Jump to navigation
Jump to search
Line 26: | Line 26: | ||
=== 2.3 TJRA2.3 AppDB | === 2.3 TJRA2.3 AppDB === | ||
*Nagios probe for checking the vmcaster.appdb.egi.eu has been developed and send to Emir. | |||
*eduGAIN support offered by the appdb-dev instance (see [https://met.refeds.org/met/met/entity/https%253A%252F%252Fappdb-dev.marie.hellasgrid.gr%252Fedugain-sp/ here]). Production instance withing the week (its not up to our team sto speed up things) | |||
*VO notification mechanism has been pushed into production. Usage guide [https://wiki.appdb.egi.eu/main:guides:notify_virtual_organization_representatives here]. | |||
*Enhanced SW series/releases editing. | |||
also please see the changelog [https://wiki.appdb.egi.eu/main:about:changelog here]. | |||
=== 2.4 TJRA2.4 e-GRANT === | === 2.4 TJRA2.4 e-GRANT === |
Revision as of 15:46, 24 June 2014
<< JRA1 weekly reports main page
1. Critical Issues
2. Major work done during the past week by task
2.1 TJRA2.1 SAM
- Support for weight factors has been merged and deployed on the development instance
- Started working on moving the standalone prefiltering code to Hadoop
- Preliminary work on the status storage
- Investigation whether the consumer component can support multiple writers
- Ongoing migration to the latest version of Lavoisier.
- Deployment of devel Lavoisier instance
2.2 TJRA2.2 Accounting
2.2.1 Accounting Repository
2.2.2 Accounting Portal
2.3 TJRA2.3 AppDB
- Nagios probe for checking the vmcaster.appdb.egi.eu has been developed and send to Emir.
- eduGAIN support offered by the appdb-dev instance (see here). Production instance withing the week (its not up to our team sto speed up things)
- VO notification mechanism has been pushed into production. Usage guide here.
- Enhanced SW series/releases editing.
also please see the changelog here.
2.4 TJRA2.4 e-GRANT
- development work on requesting for FedCloud resources