Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

EGI-InSPIRE:Jra2 2014-06-04

From EGIWiki
Revision as of 11:58, 3 June 2014 by Mhaggel (talk | contribs)
Jump to navigation Jump to search

<< JRA1 weekly reports main page



1. Critical Issues

2. Major work done during the past week by task

2.1 TJRA2.1 SAM

2.2 TJRA2.2 Accounting

2.2.1 Accounting Repository

2.2.2 Accounting Portal

2.3 TJRA2.3 AppDB


  • Monitoring the AppDB::Cloud Markeplace: a special VA has been registered (https://appdb.egi.eu/store/vappliance/fedcloud.monitoring.va) that gets updated every hour. A nagios probe will be implemented that checks the produced VA image list creation date
  • VO Notification: we are working on the VO notification mechanism, according which, the user will be able to notify one or more VOs for his newly registered VA in order to be included/endorsed into the VO-wide image list. In case of update of an already endorsed VA by one or more VOs, the VOs in respect will be notified automaticaly.
  • investigation on ELIXIR project support
  • discussion with Owne Synge about vmcaster/vmcatcher open items:

    - vmcaster: default expiration date
    - vmatcher: new images in an image lists that RP has also subscribed
    - vmcaster: switch for not using x509 certs
    - vmatcher: does the vmcatcher script retrieves the Personal Access Token (PAT) from the db?
    - vmatcher: enrich the db metadata (mpuri in separate db field? + json output)

2.4 TJRA2.4 e-GRANT

3. Next Meetings