Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Jra1 2014-03-11"

From EGIWiki
Jump to navigation Jump to search
 
(6 intermediate revisions by 3 users not shown)
Line 1: Line 1:
{{Template:EGI-Inspire menubar}}
[[Inspire_JRA1_weekly_reports| << JRA1 weekly reports main page]]  
[[Inspire_JRA1_weekly_reports| << JRA1 weekly reports main page]]  


Line 34: Line 35:


==== 3.2.2 GOCDB  ====
==== 3.2.2 GOCDB  ====
* OS upgrade to RHEL6. RAL site suffered a number of DNS/network issues that caused dropped connections. Time was spent on subsequent investigation and system monitoring / sys-admin.
* Investigation and bug fixes:
** A 'hostname' PI parameter fix for the ‘get_services’ PI method. This fixes the jump in CPU load found after deploying v5.2.
** Change the ops monitor check to check the portal landing page.
** Updated selected PI queries to use ‘fetch-joins’ in order to make queries more efficient.
** Removed a require_once glob in PI index.php (instead PI queries only require the relevant IPIQuery file). This improves performance.


==== 3.2.3 GGUS  ====
==== 3.2.3 GGUS  ====
Line 47: Line 54:


==== 3.2.5 Accounting Repository  ====
==== 3.2.5 Accounting Repository  ====
* No report received


==== 3.2.6 Accounting Portal  ====
==== 3.2.6 Accounting Portal  ====
Line 62: Line 70:
=== 3.3 TJRA1.4 (Accounting for new resource types)  ===
=== 3.3 TJRA1.4 (Accounting for new resource types)  ===
==== 3.3.1 Accounting Repository  ====
==== 3.3.1 Accounting Repository  ====
* No report received


==== 3.3.2 Accounting Portal  ====
==== 3.3.2 Accounting Portal  ====
Line 68: Line 77:


== 4. Next Meetings  ==
== 4. Next Meetings  ==
 
* Migration of SAM Central Services - 6th meeting: 18 March 2014
[[Category:JRA1_weekly_report]]
* Next JRA1 Meeting: 26 March 2014

Latest revision as of 11:55, 6 January 2015

EGI Inspire Main page


<< JRA1 weekly reports main page


1. Progress on Milestones Deliverables

  • MS711
    • Current Status: External review completed - at AMB
    • Draft Complete: 31st of January
    • Document URL: https://documents.egi.eu/document/2069
    • Moderator: Malgorzata Krakowian
    • Reviewer: Christos Kanellopoulos
  • D7.4
    • Current Status: Draft not yet completed
    • Draft Complete: 3rd of March
    • Document URL: https://documents.egi.eu/document/2121
    • Moderator: Peter Solagna
    • Reviewers: Marcin Radecky and Goncalo Borges
  • QR15
    • JRA1 contribution sent to AMB

2. Critical Issues

  • Nothing new to report

3. Major work done during the past week by task

3.1 TJRA1.1

  • Tools roadmap review
  • D7.4: draft

3.2 TJRA1.2 TJRA1.3 TJRA1.5

3.2.1 SAM

  • No report received

3.2.2 GOCDB

  • OS upgrade to RHEL6. RAL site suffered a number of DNS/network issues that caused dropped connections. Time was spent on subsequent investigation and system monitoring / sys-admin.
  • Investigation and bug fixes:
    • A 'hostname' PI parameter fix for the ‘get_services’ PI method. This fixes the jump in CPU load found after deploying v5.2.
    • Change the ops monitor check to check the portal landing page.
    • Updated selected PI queries to use ‘fetch-joins’ in order to make queries more efficient.
    • Removed a require_once glob in PI index.php (instead PI queries only require the relevant IPIQuery file). This improves performance.

3.2.3 GGUS

  • Implementation and testing of CMS integration into GGUS
  • Preparing next GGUS release
  • Ticket monitoring
  • Phoneconf to discuss GGUS development issues

3.2.4 Ops Portal

  • Evaluation of the feedback about the candidate release
  • Preparation of the release

3.2.5 Accounting Repository

  • No report received

3.2.6 Accounting Portal

  • Security work
  • Work on pay-per-use, per-user cost calculation
  • Changes on custom VO handling
  • Continuing refactor of the code
  • Updated RT tickets on dashboard

3.2.7 Metrics Portal

  • Maintenance
  • Bug fixing
  • Server updating

3.3 TJRA1.4 (Accounting for new resource types)

3.3.1 Accounting Repository

  • No report received

3.3.2 Accounting Portal

  • Work on Storage view
  • Work on MPI view

4. Next Meetings

  • Migration of SAM Central Services - 6th meeting: 18 March 2014
  • Next JRA1 Meeting: 26 March 2014