Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Jra1 2013-10-29"

From EGIWiki
Jump to navigation Jump to search
 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Template:EGI-Inspire menubar}}
[[Inspire_JRA1_weekly_reports| << JRA1 weekly reports main page]]  
[[Inspire_JRA1_weekly_reports| << JRA1 weekly reports main page]]  


Line 21: Line 22:


=== 3.1 TJRA1.1  ===
=== 3.1 TJRA1.1  ===
* '''Tools roadmap review''': a unique document, containing an overall picture of the ops tools roadmap, is now available in the document server - https://documents.egi.eu/document/1997 (the link has been added in the JRA1 wiki page). Actions/requirements blocked for some reason (dependence from another task, waiting for info from EGI.eu or NGIs, lacking of resources, etc.) are highlighted in red. '''The document will be updated monthly to have an always fresh picture of the ops tools evolution'''.   
* '''Tools roadmap review''': a unique document, containing an overall picture of the ops tools roadmap, is now available in the document server - https://documents.egi.eu/document/1997 (the link has been added in the JRA1 wiki page). Actions/requirements blocked for some reason (dependent from another task, waiting for info from EGI.eu or NGIs, lacking of resources, etc.) are highlighted in red. '''The document will be updated monthly to have an always fresh picture of the ops tools evolution'''.   
* Ops Tools requirements review
* Ops Tools requirements review
* FedCloud monitoring
* FedCloud monitoring
Line 69: Line 70:


==== 3.3.2 Accounting Portal ====
==== 3.3.2 Accounting Portal ====
* Monetary cost computation for cloud view


== 4. Next Meetings  ==
== 4. Next Meetings  ==
* Next JRA1 Meeting: 18th November 2013  
* Next JRA1 Meeting: 18th November 2013
 
[[Category:JRA1_weekly_report]]

Latest revision as of 10:43, 6 January 2015

EGI Inspire Main page


<< JRA1 weekly reports main page


1. Progress on Milestones Deliverables

  • No M&D active
  • Collecting input for QR14

2. Critical Issues

  • Cloud resources monitoring: the current SAM central instance cannot monitor Fed Cloud resources for the following reasons:
    • OCCI interface for OpenStack requires RFC compliant proxy (doesn't support legacy proxy)
    • Now SAM uses a legacy proxy to monitor the other type of EGI resources. We don't know if all kind of EGI resources already support RFC proxy
    • SAM uses a unique proxy to execute all tests. A SW mechanism to choose a proxy in function of a specific test doesn't exist inside the framework.

Then we have to use a separate SAM instance to monitor Cloud resources. We have 2 possible ways for having a unique SAM instance: (1) Campaign to verify the RFC proxy compatibility for all kind of resources monitored by EGI (2) Update SAM allowing the usage of more than 1 proxy in parallel (multi-proxies support.
We should assess both activities to understand the effort needed.

3. Major work done during the past week by task

3.1 TJRA1.1

  • Tools roadmap review: a unique document, containing an overall picture of the ops tools roadmap, is now available in the document server - https://documents.egi.eu/document/1997 (the link has been added in the JRA1 wiki page). Actions/requirements blocked for some reason (dependent from another task, waiting for info from EGI.eu or NGIs, lacking of resources, etc.) are highlighted in red. The document will be updated monthly to have an always fresh picture of the ops tools evolution.
  • Ops Tools requirements review
  • FedCloud monitoring
  • Assessment of accounting activities for PY5

3.2 TJRA1.2 TJRA1.3 TJRA1.5

3.2.1 SAM

  • SAM Update-22 passed EGI SR, releasing
  • Preparing migration guide for moving SAM central services to IN2P3
  • Updating SAM roadmap
  • Discussing integration of FedCloud monitoring probes

3.2.2 GOCDB

  • Work on property bag/extensibility mechanism.
  • Prioritise RT
  • GGUS / operational support

3.2.3 GGUS

  • Preparing and testing of next GGUS release
  • Ticket monitoring
  • GGUS-AB meeting

3.2.4 Ops Portal

  • Add the security VO branch into the broadcast
  • deployement of the test infrastructure on the CCIN2P3 cloud
  • translations of different views from Lavoisier1.* to Lavoisier2.0

3.2.5 Accounting Repository

  • No report received

3.2.6 Accounting Portal

  • Security work
  • Continuing refactor of the code
  • Work on summary view
  • Updated RT tickets on dashboard

3.2.7 Metrics Portal

  • Maintenance
  • Updated RT tickets on dashboard
  • Fixed cosmetic bugs on chrome

3.3 TJRA1.4 (Accounting for new resource types)

3.3.1 Accounting Repository

  • No report received

3.3.2 Accounting Portal

  • Monetary cost computation for cloud view

4. Next Meetings

  • Next JRA1 Meeting: 18th November 2013