Difference between revisions of "EGI-InSPIRE:Jra1 2013-09-24"
Jump to navigation
Jump to search
Line 22: | Line 22: | ||
* Preparing for v5 release. | * Preparing for v5 release. | ||
* Assisting new developer to get up to speed with v5 src code. | * Assisting new developer to get up to speed with v5 src code. | ||
* EGI TF2013 Madrid | |||
==== 3.2.3 GGUS ==== | ==== 3.2.3 GGUS ==== |
Revision as of 18:10, 24 September 2013
<< JRA1 weekly reports main page
1. Progress on Milestones Deliverables
2. Critical Issues
3. Major work done during the past week by task
3.1 TJRA1.1
3.2 TJRA1.2 TJRA1.3 TJRA1.5
3.2.1 SAM
- Validation of SAM Update 22 and preparations for SR
- Status update at EGI TF2013 Madrid
- SAM office at EGI TF2013
- Participation in SAM migration task force initial meeting at EGI TF2013
3.2.2 GOCDB
- Preparing for v5 release.
- Assisting new developer to get up to speed with v5 src code.
- EGI TF2013 Madrid
3.2.3 GGUS
- EGI TF2013 Madrid
3.2.4 Ops Portal
- EGI TF2013 Madrid
- Finalization of the VO Module for the refactoring