Difference between revisions of "EGI-InSPIRE:Jra1 2013-09-10"
Jump to navigation
Jump to search
Line 19: | Line 19: | ||
==== 3.2.2 GOCDB ==== | ==== 3.2.2 GOCDB ==== | ||
* Ops support, v5 verification and testing | |||
* New starter induction (replacement for JC) | |||
==== 3.2.3 GGUS ==== | ==== 3.2.3 GGUS ==== |
Revision as of 18:05, 9 September 2013
<< JRA1 weekly reports main page
1. Progress on Milestones Deliverables
2. Critical Issues
3. Major work done during the past week by task
3.1 TJRA1.1
3.2 TJRA1.2 TJRA1.3 TJRA1.5
3.2.1 SAM
- Validation of SAM Update 22
- GOCDB v5 testing
3.2.2 GOCDB
- Ops support, v5 verification and testing
- New starter induction (replacement for JC)