Difference between revisions of "EGI-InSPIRE:Italy-QR7"

From EGIWiki
Jump to: navigation, search
Line 42: Line 42:
 
! Outcome (Short report & Indico URL)
 
! Outcome (Short report & Indico URL)
 
|-
 
|-
| <span lang="EN-US" style="font-size:10.0pt;line-height:
+
| <span lang="EN-US">Dec, 13-14, 2011</span>
115%;font-family:&quot;Calibri","sans-serif";mso-ascii-theme-font:minor-latin;
+
| <span lang="EN-US">Bologna, Italy</span>
mso-fareast-font-family:"Times New Roman";mso-hansi-theme-font:minor-latin;
+
| <span lang="EN-US" style="font-size: 10pt; line-height: 115%; font-family: Calibri, sans-serif;">Security handling and monitoring in the INFN and
mso-bidi-theme-font:minor-latin;mso-ansi-language:EN-US;mso-fareast-language:
+
 
IT-CH;mso-bidi-language:AR-SA">Dec, 13-14, 2011</span>
+
IGI sites
| <span lang="EN-US" style="font-size:10.0pt;line-height:
+
 
115%;font-family:&quot;Calibri","sans-serif";mso-ascii-theme-font:minor-latin;
+
 
mso-fareast-font-family:"Times New Roman";mso-hansi-theme-font:minor-latin;
+
</span>
mso-bidi-theme-font:minor-latin;mso-ansi-language:EN-US;mso-fareast-language:
+
| <span lang="EN-US">27 (2 NGI_IT csirt + 25 site security officers)</span>  
IT-CH;mso-bidi-language:AR-SA">Bologna, Italy</span>
+
| <span lang="EN-US" style="font-size: 10pt; line-height: 115%; font-family: Calibri, sans-serif;">This two days workshop has been organized,
| <span lang="EN-US" style="font-size: 10pt; line-height: 115%; font-family: Calibri, sans-serif; ">Security handling and monitoring in the INFN and
+
 
IGI sites</span>
+
together with the INFN security group, in order to review the following topics:
| <span lang="EN-US" style="font-size:10.0pt;line-height:
+
 
115%;font-family:&quot;Calibri","sans-serif";mso-ascii-theme-font:minor-latin;
+
 
mso-fareast-font-family:"Times New Roman";mso-hansi-theme-font:minor-latin;
+
1) Incident response procedures adopted in EGI/IGI and national NREN
mso-bidi-theme-font:minor-latin;mso-ansi-language:EN-US;mso-fareast-language:
+
 
IT-CH;mso-bidi-language:AR-SA">27 (2 NGI_IT csirt + 25 site security officers)</span>
+
 
| <span lang="EN-US" style="font-size: 10pt; line-height: 115%; font-family: Calibri, sans-serif; ">This two days workshop has been organized,
+
2) Tools and methods for the monitoring of site security
 +
 
 +
 
 +
3) Tools and methods for the live incident response and post mortem analysis.
 +
 
 +
 
 +
 
 +
</span>
 +
|-
 +
| <span lang="EN-US">Dec, 13-14, 2011</span>
 +
| <span lang="EN-US">Bologna, Italy</span>  
 +
| <span lang="EN-US" style="font-size: 10pt; line-height: 115%; font-family: Calibri, sans-serif;">Security handling and monitoring in the INFN and
 +
 
 +
IGI sites
 +
 
 +
 
 +
</span>
 +
| <span lang="EN-US">27 (2 NGI_IT csirt + 25 site security officers)</span>  
 +
| <span lang="EN-US" style="font-size: 10pt; line-height: 115%; font-family: Calibri, sans-serif;">This two days workshop has been organized,
 +
 
 
together with the INFN security group, in order to review the following topics:
 
together with the INFN security group, in order to review the following topics:
 +
  
 
1) Incident response procedures adopted in EGI/IGI and national NREN
 
1) Incident response procedures adopted in EGI/IGI and national NREN
 +
  
 
2) Tools and methods for the monitoring of site security
 
2) Tools and methods for the monitoring of site security
 +
  
 
3) Tools and methods for the live incident response and post mortem analysis.
 
3) Tools and methods for the live incident response and post mortem analysis.
 +
 +
 +
 +
</span>
 +
|-
 +
| <span lang="EN-US">Dec, 13-14, 2011</span>
 +
| <span lang="EN-US">Bologna, Italy</span>
 +
| <span lang="EN-US" style="font-size: 10pt; line-height: 115%; font-family: Calibri, sans-serif;">Security handling and monitoring in the INFN and
 +
 +
IGI sites
 +
 +
 +
</span>
 +
| <span lang="EN-US">27 (2 NGI_IT csirt + 25 site security officers)</span>
 +
| <span lang="EN-US" style="font-size: 10pt; line-height: 115%; font-family: Calibri, sans-serif;">This two days workshop has been organized,
 +
 +
together with the INFN security group, in order to review the following topics:
 +
 +
 +
1) Incident response procedures adopted in EGI/IGI and national NREN
 +
 +
 +
2) Tools and methods for the monitoring of site security
 +
 +
 +
3) Tools and methods for the live incident response and post mortem analysis.
 +
 +
 +
 +
</span>
 +
|-
 +
| <span lang="EN-US">Dec, 13-14, 2011</span>
 +
| <span lang="EN-US">Bologna, Italy</span>
 +
| <span lang="EN-US" style="font-size: 10pt; line-height: 115%; font-family: Calibri, sans-serif;">Security handling and monitoring in the INFN and
 +
 +
IGI sites
 +
 +
 +
</span>
 +
| <span lang="EN-US">27 (2 NGI_IT csirt + 25 site security officers)</span>
 +
| <span lang="EN-US" style="font-size: 10pt; line-height: 115%; font-family: Calibri, sans-serif;">This two days workshop has been organized,
 +
 +
together with the INFN security group, in order to review the following topics:
 +
 +
 +
1) Incident response procedures adopted in EGI/IGI and national NREN
 +
 +
 +
2) Tools and methods for the monitoring of site security
 +
 +
 +
3) Tools and methods for the live incident response and post mortem analysis.
 +
 +
 +
 
</span>
 
</span>
 
|}
 
|}
Line 101: Line 178:
 
=== 2.1. Progress Summary  ===
 
=== 2.1. Progress Summary  ===
  
==== 2.1.1. GARR &nbsp; ====
+
==== 2.1.1. GARR &nbsp; ====
  
==== 2.1.2. INFN &nbsp; ====
+
==== 2.1.2. INFN &nbsp; ====
  
 
=== 2.2. Main Achievements  ===
 
=== 2.2. Main Achievements  ===
  
==== 2.2.1. GARR &nbsp; ====
+
==== 2.2.1. GARR &nbsp; ====
  
 
*Started setting up IPv6 testbed  
 
*Started setting up IPv6 testbed  
Line 124: Line 201:
 
*Restart (after re-installation) production HINTS server at GARR
 
*Restart (after re-installation) production HINTS server at GARR
  
==== 2.2.2. INFN &nbsp; ====
+
==== 2.2.2. INFN &nbsp; ====
  
 
=== 2.3. Issues and mitigation  ===
 
=== 2.3. Issues and mitigation  ===

Revision as of 23:53, 6 February 2012


Quarterly Report Number NGI Name Partner Name Author
QR7 IGI GARR M. Reale
QR7 IGI INFN P. Veronesi


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
Dec, 13-14, 2011 Bologna, Italy Security handling and monitoring in the INFN and

IGI sites


27 (2 NGI_IT csirt + 25 site security officers) This two days workshop has been organized,

together with the INFN security group, in order to review the following topics:


1) Incident response procedures adopted in EGI/IGI and national NREN


2) Tools and methods for the monitoring of site security


3) Tools and methods for the live incident response and post mortem analysis.


Dec, 13-14, 2011 Bologna, Italy Security handling and monitoring in the INFN and

IGI sites


27 (2 NGI_IT csirt + 25 site security officers) This two days workshop has been organized,

together with the INFN security group, in order to review the following topics:


1) Incident response procedures adopted in EGI/IGI and national NREN


2) Tools and methods for the monitoring of site security


3) Tools and methods for the live incident response and post mortem analysis.


Dec, 13-14, 2011 Bologna, Italy Security handling and monitoring in the INFN and

IGI sites


27 (2 NGI_IT csirt + 25 site security officers) This two days workshop has been organized,

together with the INFN security group, in order to review the following topics:


1) Incident response procedures adopted in EGI/IGI and national NREN


2) Tools and methods for the monitoring of site security


3) Tools and methods for the live incident response and post mortem analysis.


Dec, 13-14, 2011 Bologna, Italy Security handling and monitoring in the INFN and

IGI sites


27 (2 NGI_IT csirt + 25 site security officers) This two days workshop has been organized,

together with the INFN security group, in order to review the following topics:


1) Incident response procedures adopted in EGI/IGI and national NREN


2) Tools and methods for the monitoring of site security


3) Tools and methods for the live incident response and post mortem analysis.


1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
test


===1.3. PUBLICATIONS===

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

2.1.1. GARR  

2.1.2. INFN  

2.2. Main Achievements

2.2.1. GARR  

  • Started setting up IPv6 testbed
  • Finalized IPv6 survery for NGIs
  • Documented IPv6 status on Wiki
  • Collaborated with HEPiX IPv6 WG setting up node at GARR and providing testbed verification scripts for GridFTP
  • Enrolled new HINTS users for testing HINTS
  • Defined workplan schedule for HINTS
  • Disseminated on PerfSONAR MDM tools towards NGIs

Plans for the next period

  • Keep consolidating HINTS and providing the 64-bit architecture HINTS probe
  • Continue the deployment campaing for HINTS
  • Provide more structures support for PerfSONAR-MDM and disseminate about it by the Tier-2 sites, in collaboration with DANTE
  • Restart (after re-installation) production HINTS server at GARR

2.2.2. INFN  

2.3. Issues and mitigation

Issue Description Mitigation Description
GARR: Suffered major security accident at GARR, HINTS server hacked and unavailable Security policy at GARR has been completely reviewed and hardened considerably.
GARR: DownCollector required upgrade to GOCDB4 Currenlty no manpower available for this.
INFN: Miti