Difference between revisions of "EGI-InSPIRE:Italy-QR7"

From EGIWiki
Jump to: navigation, search
Line 32: Line 32:
 
Note: Complete the tables below by adding as many rows as needed. -->  
 
Note: Complete the tables below by adding as many rows as needed. -->  
  
=== 1.1. CONFERENCES/WORKSHOPS ORGANISED ===
+
=== 1.1. CONFERENCES/WORKSHOPS ORGANISED ===
  
 
{| border="1" cellspacing="0"
 
{| border="1" cellspacing="0"
 
|-
 
|-
! scope="col" | Date
+
! scope="col" | Date  
! Location
+
! Location  
! Title
+
! Title  
! Participants
+
! Participants  
 
! Outcome (Short report & Indico URL)
 
! Outcome (Short report & Indico URL)
 
|-
 
|-
| test
+
| <span lang="EN-US" style="font-size:10.0pt;line-height:
|  
+
115%;font-family:&quot;Calibri","sans-serif";mso-ascii-theme-font:minor-latin;
|  
+
mso-fareast-font-family:"Times New Roman";mso-hansi-theme-font:minor-latin;
|  
+
mso-bidi-theme-font:minor-latin;mso-ansi-language:EN-US;mso-fareast-language:
|  
+
IT-CH;mso-bidi-language:AR-SA">Dec, 13-14, 2011</span>
 +
| <span lang="EN-US" style="font-size:10.0pt;line-height:
 +
115%;font-family:&quot;Calibri","sans-serif";mso-ascii-theme-font:minor-latin;
 +
mso-fareast-font-family:"Times New Roman";mso-hansi-theme-font:minor-latin;
 +
mso-bidi-theme-font:minor-latin;mso-ansi-language:EN-US;mso-fareast-language:
 +
IT-CH;mso-bidi-language:AR-SA">Bologna, Italy</span>
 +
| <span lang="EN-US" style="font-size: 10pt; line-height: 115%; font-family: Calibri, sans-serif; ">Security handling and monitoring in the INFN and
 +
IGI sites</span>
 +
| <span lang="EN-US" style="font-size:10.0pt;line-height:
 +
115%;font-family:&quot;Calibri","sans-serif";mso-ascii-theme-font:minor-latin;
 +
mso-fareast-font-family:"Times New Roman";mso-hansi-theme-font:minor-latin;
 +
mso-bidi-theme-font:minor-latin;mso-ansi-language:EN-US;mso-fareast-language:
 +
IT-CH;mso-bidi-language:AR-SA">27 (2 NGI_IT csirt + 25 site security officers)</span>
 +
| <span lang="EN-US" style="font-size: 10pt; line-height: 115%; font-family: Calibri, sans-serif; ">This two days workshop has been organized,
 +
together with the INFN security group, in order to review the following topics:
 +
 
 +
1) Incident response procedures adopted in EGI/IGI and national NREN
 +
 
 +
2) Tools and methods for the monitoring of site security
 +
 
 +
3) Tools and methods for the live incident response and post mortem analysis.
 +
</span>
 
|}
 
|}
  
=== 1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED ===
+
=== 1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED ===
  
 
{| border="1" cellspacing="0"
 
{| border="1" cellspacing="0"
 
|-
 
|-
! scope="col" | Date
+
! scope="col" | Date  
! Location
+
! Location  
! Title
+
! Title  
! Participants
+
! Participants  
 
! Outcome (Short report &amp; Indico URL)
 
! Outcome (Short report &amp; Indico URL)
 
|-
 
|-
| test
+
| test  
 
|  
 
|  
 
|  
 
|  
Line 66: Line 87:
 
|}
 
|}
  
 
+
<br> ===1.3. PUBLICATIONS=== <!--List all publications as bullet points, detailing: Publication title, author(s), journal title, number/issue, date. Also mention any articles published further to interviews given by members of your activity.-->  
===1.3. PUBLICATIONS=== <!--List all publications as bullet points, detailing: Publication title, author(s), journal title, number/issue, date. Also mention any articles published further to interviews given by members of your activity.-->  
 
  
 
{| border="1" cellspacing="0" cellpadding="2"
 
{| border="1" cellspacing="0" cellpadding="2"
 
|-
 
|-
! scope="col" | Publication title
+
! scope="col" | Publication title  
! Journal / Proceedings title
+
! Journal / Proceedings title  
! align="left" | Journal references<br> ''Volume number<br> Issue<br><br>Pages from - to''
+
! align="left" | Journal references<br> ''Volume number<br> Issue<br><br>Pages from - to''  
 
! align="left" | Authors ''<br>1.<br>2.<br>3.<br>Et al?''
 
! align="left" | Authors ''<br>1.<br>2.<br>3.<br>Et al?''
 
|}
 
|}
Line 79: Line 99:
 
== 2. ACTIVITY REPORT == <!--''Note: just report activities relevant to this Quarter.''-->  
 
== 2. ACTIVITY REPORT == <!--''Note: just report activities relevant to this Quarter.''-->  
  
=== 2.1. Progress Summary ===
+
=== 2.1. Progress Summary ===
==== 2.1.1. GARR  ====
+
 
 +
==== 2.1.1. GARR &nbsp; ====
 +
 
 +
==== 2.1.2. INFN &nbsp; ====
 +
 
 +
=== 2.2. Main Achievements  ===
 +
 
 +
==== 2.2.1. GARR &nbsp; ====
 +
 
 +
*Started setting up IPv6 testbed
 +
*Finalized IPv6 survery for NGIs
 +
*Documented IPv6 status on Wiki
 +
*Collaborated with HEPiX IPv6 WG setting up node at GARR and providing testbed verification scripts for GridFTP
 +
*Enrolled new HINTS users for testing HINTS
 +
*Defined workplan schedule for HINTS
 +
*Disseminated on PerfSONAR MDM tools towards NGIs
  
==== 2.1.2. INFN  ====
+
'''Plans for the next period'''
  
=== 2.2. Main Achievements ===
+
*Keep consolidating HINTS and providing the 64-bit architecture HINTS probe
==== 2.2.1. GARR  ====
+
*Continue the deployment campaing for HINTS  
* Started setting up IPv6 testbed
+
*Provide more structures support for PerfSONAR-MDM and disseminate about it by the Tier-2 sites, in collaboration with DANTE
* Finalized IPv6 survery for NGIs
+
*Restart (after re-installation) production HINTS server at GARR
* Documented IPv6 status on Wiki
 
* Collaborated with HEPiX IPv6 WG setting up node at GARR and providing testbed verification scripts for GridFTP
 
* Enrolled new HINTS users for testing HINTS
 
* Defined workplan schedule for HINTS
 
* Disseminated on PerfSONAR MDM tools towards NGIs
 
  
'''Plans for the next period'''
+
==== 2.2.2. INFN &nbsp; ====
* Keep consolidating HINTS and providing the 64-bit architecture HINTS probe
 
* Continue the deployment campaing for HINTS
 
* Provide more structures support for PerfSONAR-MDM and disseminate about it by the Tier-2 sites, in collaboration with DANTE
 
* Restart (after re-installation) production HINTS server at GARR
 
  
==== 2.2.2. INFN  ====
+
=== 2.3. Issues and mitigation  ===
  
=== 2.3. Issues and mitigation ===
 
 
{| border="1" cellspacing="0" cellpadding="2"
 
{| border="1" cellspacing="0" cellpadding="2"
 
|-
 
|-
Line 114: Line 139:
 
| Currenlty no manpower available for this.
 
| Currenlty no manpower available for this.
 
|-
 
|-
| INFN:
+
| INFN:  
| Miti  
+
| Miti
 
|}
 
|}

Revision as of 23:52, 6 February 2012


Quarterly Report Number NGI Name Partner Name Author
QR7 IGI GARR M. Reale
QR7 IGI INFN P. Veronesi


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
Dec, 13-14, 2011 Bologna, Italy Security handling and monitoring in the INFN and

IGI sites

27 (2 NGI_IT csirt + 25 site security officers) This two days workshop has been organized,

together with the INFN security group, in order to review the following topics:

1) Incident response procedures adopted in EGI/IGI and national NREN

2) Tools and methods for the monitoring of site security

3) Tools and methods for the live incident response and post mortem analysis.

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
test


===1.3. PUBLICATIONS===

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

2.1.1. GARR  

2.1.2. INFN  

2.2. Main Achievements

2.2.1. GARR  

  • Started setting up IPv6 testbed
  • Finalized IPv6 survery for NGIs
  • Documented IPv6 status on Wiki
  • Collaborated with HEPiX IPv6 WG setting up node at GARR and providing testbed verification scripts for GridFTP
  • Enrolled new HINTS users for testing HINTS
  • Defined workplan schedule for HINTS
  • Disseminated on PerfSONAR MDM tools towards NGIs

Plans for the next period

  • Keep consolidating HINTS and providing the 64-bit architecture HINTS probe
  • Continue the deployment campaing for HINTS
  • Provide more structures support for PerfSONAR-MDM and disseminate about it by the Tier-2 sites, in collaboration with DANTE
  • Restart (after re-installation) production HINTS server at GARR

2.2.2. INFN  

2.3. Issues and mitigation

Issue Description Mitigation Description
GARR: Suffered major security accident at GARR, HINTS server hacked and unavailable Security policy at GARR has been completely reviewed and hardened considerably.
GARR: DownCollector required upgrade to GOCDB4 Currenlty no manpower available for this.
INFN: Miti