Difference between revisions of "EGI-InSPIRE:Italy-QR7"

From EGIWiki
Jump to: navigation, search
Line 66: Line 66:
 
|}
 
|}
  
<!--
 
Please, fill the fields replacing <...> sections with your data. You can add a line copyng the two lines:
 
|<Date>||<Location>||Title||Participants||Outcome
 
|-
 
-->
 
  
 
===1.3. PUBLICATIONS=== <!--List all publications as bullet points, detailing: Publication title, author(s), journal title, number/issue, date. Also mention any articles published further to interviews given by members of your activity.-->  
 
===1.3. PUBLICATIONS=== <!--List all publications as bullet points, detailing: Publication title, author(s), journal title, number/issue, date. Also mention any articles published further to interviews given by members of your activity.-->  

Revision as of 23:50, 6 February 2012


Quarterly Report Number NGI Name Partner Name Author
QR7 IGI GARR M. Reale
QR7 IGI INFN P. Veronesi


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
test

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
test


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

2.1.1. GARR  

2.1.2. INFN  

2.2. Main Achievements

2.2.1. GARR  

  • Started setting up IPv6 testbed
  • Finalized IPv6 survery for NGIs
  • Documented IPv6 status on Wiki
  • Collaborated with HEPiX IPv6 WG setting up node at GARR and providing testbed verification scripts for GridFTP
  • Enrolled new HINTS users for testing HINTS
  • Defined workplan schedule for HINTS
  • Disseminated on PerfSONAR MDM tools towards NGIs

Plans for the next period

  • Keep consolidating HINTS and providing the 64-bit architecture HINTS probe
  • Continue the deployment campaing for HINTS
  • Provide more structures support for PerfSONAR-MDM and disseminate about it by the Tier-2 sites, in collaboration with DANTE
  • Restart (after re-installation) production HINTS server at GARR

2.2.2. INFN  

2.3. Issues and mitigation

Issue Description Mitigation Description
GARR: Suffered major security accident at GARR, HINTS server hacked and unavailable Security policy at GARR has been completely reviewed and hardened considerably.
GARR: DownCollector required upgrade to GOCDB4 Currenlty no manpower available for this.
INFN: Miti