Quarterly Report Number NGI Name Partner Name Author
QR6 IGI GARR M. Reale
QR6 IGI INFN L. Gaido, P. Veronesi


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
September 19-23, 2011 Lyon EGI-TF 10 Participation in different sessions(Presentation: “Storage accounting with DGAS and HLRmon"). The poster on the IGI portal has been awarded as the best of the event
September 19-23, 2011 Lyon OGF 33 1 Presentation and discussion: “Next Generation Usage Records"


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1.1. GARR

2.1.2. INFN

IGI statutes and legal structure are being finalized, while IGI has started working as INFN Special Project, with expected duration of about 1 year, which will end when IGI will start as an independent legal structure.


  • Resource centers coordination
    • good overall results in the league table for this quarter: May (98%/98%), June (97%/97%), July (NA);
    • Operation problems are discussed in the regular coordination meeting. The ROD team works well. Grid services are maintained up-to-date, but services have not been migrated to EMI/UMD yet.


    • Two new sites (INFN-MIB and GARR-01-DIR) have been certified during this quarter.
  • Core Services
    • In the reported period the operation team keeps the Grid core services running smoothly and updated in the region.
  • Early Adopter activity
    • Early adopter activity has been carried out for several products:
      • WMS
        • 3.3.2 (started at the end of july and finished in the first part of August) rejected from UMD
        • 3.3.3 (~06.09.2011) rejected from UMD
        • 3.3.4 (20.10.2011) was performed for EMI but rejected (did not reached the Staged Rollout in UMD)
    • Early adopter activity for Nagios regarded the updates 10.1, 11 and 11.1. While the 10.1 was a fix for an issue with gLExec profile into update 10, update 11.1 contained a fix for a failure we encountered at yaim config time during update 10. Temporary fix to the problem has been implemented manually removing a column index into metric store database.


2.2. Main Achievements

2.3. Issues and mitigation

Issue Description Mitigation Description