Difference between revisions of "EGI-InSPIRE:Italy-QR4"

From EGIWiki
Jump to: navigation, search
Line 30: Line 30:
  
 
===  ===
 
===  ===
 +
 +
{| border="1" cellspacing="0" style="font-size: 13px; color: black; background-color: white; margin-top: 0px; margin-right: 0px; margin-bottom: 0px; margin-left: 5px; "
 +
|-
 +
! scope="col" | Date
 +
! Location
 +
! Title
 +
! Participants
 +
! Outcome (Short report & Indico URL)
 +
|}
 +
 +
===  ===
 +
 +
=== 1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED ===
 +
 +
  
 
{| border="1" cellspacing="0" style="font-size: 13px; color: black; background-color: white; margin-top: 0px; margin-right: 0px; margin-bottom: 0px; margin-left: 5px; "
 
{| border="1" cellspacing="0" style="font-size: 13px; color: black; background-color: white; margin-top: 0px; margin-right: 0px; margin-bottom: 0px; margin-left: 5px; "
Line 43: Line 58:
 
| EGI UF
 
| EGI UF
 
| 6
 
| 6
| (1 demo, 1 poster, 1 talk, 2 booths) <span class="Apple-style-span" style="line-height: 19px; ">[http://uf2011.egi.eu/ http://uf2011.egi.eu/]</span>
+
| (1 demo, 1 poster, 1 talk, 2 booths)&nbsp;[http://uf2011.egi.eu/ http://uf2011.egi.eu/]
 
|}
 
|}
  
===  ===
 
  
=== 1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED  ===
 
  
{| border="1" cellspacing="0"
+
 
|-
 
! scope="col" | Date
 
! Location
 
! Title
 
! Participants
 
! Outcome (Short report &amp; Indico URL) <!-- formatting text -->
 
|}
 
  
 
<!--
 
<!--
Line 83: Line 89:
 
===2.1. Progress Summary=== <!-- Provide your test below -->  
 
===2.1. Progress Summary=== <!-- Provide your test below -->  
  
====2.1.1. GARR====
+
==== 2.1.1. GARR ====
  
====2.1.2. INFN====
+
==== 2.1.2. INFN ====
 +
 
 +
*Italian NGI (IGI) has been setup and the transition from ROC has been completed.&nbsp;
 +
*Availability/Reliability:&nbsp;Feb (95%/97%), Mar (96%/97%) , Apr (NA).&nbsp;
 +
*Site changes:&nbsp;GRISU-COMETA-UNICT-DIIT and GRISU-ENEA-GRID has been suspended on April for low availability and very long downtime period. The new site INFN-BOLOGNA-T3 has been certified on April.
 +
 
 +
*
  
 
===2.2. Main Achievements=== <!--
 
===2.2. Main Achievements=== <!--
Line 91: Line 103:
 
-->  
 
-->  
  
====2.2.1. GARR====
+
==== 2.2.1. GARR ====
 
 
====2.2.2. INFN====
 
  
 +
==== 2.2.2. INFN ====
  
 +
*The italian LFC service supports several VOs (argo, ams02.cern.ch, babar, bio, cdf, compchem, comput-er.it, superbvo.org, eticsproject.eu, enea, glast.org, gridit, inaf, infngrid, ingv, libi, pacs.infn.it, pamela, planck, theophys, tps.infn.it, virgo, euchina, enmr.eu, euindia, cyclops, compassit). The setup of this core service has been migrated to a high availability and fault tolerance configuration (two frontends and a dedicated server for the mysql backend, all checked via nagios).
  
 
=== 2.3. Issues and mitigation  ===
 
=== 2.3. Issues and mitigation  ===

Revision as of 17:18, 27 April 2011


Quarterly Report Number NGI Name Partner Name Author
QR4 IGI <NGI Country> Paolo Veronesi


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
April 11-15, 2011 Vilnius EGI UF 6 (1 demo, 1 poster, 1 talk, 2 booths) http://uf2011.egi.eu/




1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

2.1.1. GARR

2.1.2. INFN

  • Italian NGI (IGI) has been setup and the transition from ROC has been completed. 
  • Availability/Reliability: Feb (95%/97%), Mar (96%/97%) , Apr (NA). 
  • Site changes: GRISU-COMETA-UNICT-DIIT and GRISU-ENEA-GRID has been suspended on April for low availability and very long downtime period. The new site INFN-BOLOGNA-T3 has been certified on April.

2.2. Main Achievements

2.2.1. GARR

2.2.2. INFN

  • The italian LFC service supports several VOs (argo, ams02.cern.ch, babar, bio, cdf, compchem, comput-er.it, superbvo.org, eticsproject.eu, enea, glast.org, gridit, inaf, infngrid, ingv, libi, pacs.infn.it, pamela, planck, theophys, tps.infn.it, virgo, euchina, enmr.eu, euindia, cyclops, compassit). The setup of this core service has been migrated to a high availability and fault tolerance configuration (two frontends and a dedicated server for the mysql backend, all checked via nagios).

2.3. Issues and mitigation

Issue Description Mitigation Description