Difference between revisions of "EGI-InSPIRE:Italy-QR4"
Jump to navigation
Jump to search
Line 30: | Line 30: | ||
=== === | === === | ||
{| border="1" cellspacing="0" style="font-size: 13px; color: black; background-color: white; margin-top: 0px; margin-right: 0px; margin-bottom: 0px; margin-left: 5px; " | |||
|- | |||
! scope="col" | Date | |||
! Location | |||
! Title | |||
! Participants | |||
! Outcome (Short report & Indico URL) | |||
|} | |||
=== === | |||
=== 1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED === | |||
{| border="1" cellspacing="0" style="font-size: 13px; color: black; background-color: white; margin-top: 0px; margin-right: 0px; margin-bottom: 0px; margin-left: 5px; " | {| border="1" cellspacing="0" style="font-size: 13px; color: black; background-color: white; margin-top: 0px; margin-right: 0px; margin-bottom: 0px; margin-left: 5px; " | ||
Line 43: | Line 58: | ||
| EGI UF | | EGI UF | ||
| 6 | | 6 | ||
| (1 demo, 1 poster, 1 talk, 2 booths) | | (1 demo, 1 poster, 1 talk, 2 booths) [http://uf2011.egi.eu/ http://uf2011.egi.eu/] | ||
|} | |} | ||
<!-- | <!-- | ||
Line 83: | Line 89: | ||
===2.1. Progress Summary=== <!-- Provide your test below --> | ===2.1. Progress Summary=== <!-- Provide your test below --> | ||
====2.1.1. GARR==== | ==== 2.1.1. GARR ==== | ||
====2.1.2. INFN==== | ==== 2.1.2. INFN ==== | ||
*Italian NGI (IGI) has been setup and the transition from ROC has been completed. | |||
*Availability/Reliability: Feb (95%/97%), Mar (96%/97%) , Apr (NA). | |||
*Site changes: GRISU-COMETA-UNICT-DIIT and GRISU-ENEA-GRID has been suspended on April for low availability and very long downtime period. The new site INFN-BOLOGNA-T3 has been certified on April. | |||
* | |||
===2.2. Main Achievements=== <!-- | ===2.2. Main Achievements=== <!-- | ||
Line 91: | Line 103: | ||
--> | --> | ||
====2.2.1. GARR | ==== 2.2.1. GARR ==== | ||
==== 2.2.2. INFN ==== | |||
*The italian LFC service supports several VOs (argo, ams02.cern.ch, babar, bio, cdf, compchem, comput-er.it, superbvo.org, eticsproject.eu, enea, glast.org, gridit, inaf, infngrid, ingv, libi, pacs.infn.it, pamela, planck, theophys, tps.infn.it, virgo, euchina, enmr.eu, euindia, cyclops, compassit). The setup of this core service has been migrated to a high availability and fault tolerance configuration (two frontends and a dedicated server for the mysql backend, all checked via nagios). | |||
=== 2.3. Issues and mitigation === | === 2.3. Issues and mitigation === |
Revision as of 17:18, 27 April 2011
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
QR4 | IGI | <NGI Country> | Paolo Veronesi |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
April 11-15, 2011 | Vilnius | EGI UF | 6 | (1 demo, 1 poster, 1 talk, 2 booths) http://uf2011.egi.eu/ |
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
2.1.1. GARR
2.1.2. INFN
- Italian NGI (IGI) has been setup and the transition from ROC has been completed.
- Availability/Reliability: Feb (95%/97%), Mar (96%/97%) , Apr (NA).
- Site changes: GRISU-COMETA-UNICT-DIIT and GRISU-ENEA-GRID has been suspended on April for low availability and very long downtime period. The new site INFN-BOLOGNA-T3 has been certified on April.
2.2. Main Achievements
2.2.1. GARR
2.2.2. INFN
- The italian LFC service supports several VOs (argo, ams02.cern.ch, babar, bio, cdf, compchem, comput-er.it, superbvo.org, eticsproject.eu, enea, glast.org, gridit, inaf, infngrid, ingv, libi, pacs.infn.it, pamela, planck, theophys, tps.infn.it, virgo, euchina, enmr.eu, euindia, cyclops, compassit). The setup of this core service has been migrated to a high availability and fault tolerance configuration (two frontends and a dedicated server for the mysql backend, all checked via nagios).
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|