Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Italy-QR4"

From EGIWiki
Jump to navigation Jump to search
Line 55: Line 55:
| Poznan  
| Poznan  
| GN3 SA2 T3 kick Off Meeting  
| GN3 SA2 T3 kick Off Meeting  
| M.Reale, N.Ciurleo  
| GARR: M.Reale, N.Ciurleo  
| Formalized participation of EGI Net Sup in PerfSONAR User Panel. Report (protected by GN3 wiki password: [https://intranet.geant.net/sites/Services/SA2/T3/Documents/Meetings%20and%20Calls/ST-GN3-20110215-SA2%20T3%20Feb%202011%20Poznan%20meeting%20minutes.docx] URL: [https://intranet.geant.net/sites/Services/SA2/T3/Meetings/SA2T3meetingFeb2011inPoznan/default.aspx]
| Formalized participation of EGI Net Sup in PerfSONAR User Panel. Report (protected by GN3 wiki password: [https://intranet.geant.net/sites/Services/SA2/T3/Documents/Meetings%20and%20Calls/ST-GN3-20110215-SA2%20T3%20Feb%202011%20Poznan%20meeting%20minutes.docx] URL: [https://intranet.geant.net/sites/Services/SA2/T3/Meetings/SA2T3meetingFeb2011inPoznan/default.aspx]
|-
|-
Line 67: Line 67:
| Vilnius  
| Vilnius  
| EGI UF  
| EGI UF  
| 6  
| 6 INFN, 3 GARR
| (1 demo, 1 poster, 1 talk, 2 booths);[http://uf2011.egi.eu/ http://uf2011.egi.eu/]
| (1 demo, 1 poster, 1 talk, 2 booths);[http://uf2011.egi.eu/ http://uf2011.egi.eu/]
|}
|}

Revision as of 09:08, 28 April 2011


Quarterly Report Number NGI Name Partner Name Author
QR4 IGI <NGI Country> Paolo Veronesi


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
February 7-8, 2011 Poznan GN3 SA2 T3 kick Off Meeting GARR: M.Reale, N.Ciurleo Formalized participation of EGI Net Sup in PerfSONAR User Panel. Report (protected by GN3 wiki password: [1] URL: [2]
April 7, 2011 VCONF Network Support update 10 on behalf of GARR IGI, CNRS UREC, DSI CNRS, RedIRIS, DANTE, SWITCH Defined long term strategy for Network Support coordination for EGI. Short Report: [3]
April 11-15, 2011 Vilnius EGI UF 6 INFN, 3 GARR (1 demo, 1 poster, 1 talk, 2 booths);http://uf2011.egi.eu/



1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

2.1.1. GARR

2.1.2. INFN

  • Italian NGI (IGI) has been setup and the transition from ROC has been completed. 
  • Availability/Reliability: Feb (95%/97%), Mar (96%/97%) , Apr (NA). 
  • Site changes: GRISU-COMETA-UNICT-DIIT and GRISU-ENEA-GRID has been suspended on April for low availability and very long downtime period. The new site INFN-BOLOGNA-T3 has been certified on April.

2.2. Main Achievements

2.2.1. GARR

2.2.2. INFN

  • The italian LFC service supports several VOs (argo, ams02.cern.ch, babar, bio, cdf, compchem, comput-er.it, superbvo.org, eticsproject.eu, enea, glast.org, gridit, inaf, infngrid, ingv, libi, pacs.infn.it, pamela, planck, theophys, tps.infn.it, virgo, euchina, enmr.eu, euindia, cyclops, compassit). The setup of this core service has been migrated to a high availability and fault tolerance configuration (two frontends and a dedicated server for the mysql backend, all checked via nagios).

2.3. Issues and mitigation

Issue Description Mitigation Description