Difference between revisions of "EGI-InSPIRE:Italy-QR4"
Jump to navigation
Jump to search
Line 56: | Line 56: | ||
| GN3 SA2 T3 kick Off Meeting | | GN3 SA2 T3 kick Off Meeting | ||
| 10 on behalf of GARR IGI, CNRS UREC, DSI CNRS, RedIRIS, DANTE, SWITCH | | 10 on behalf of GARR IGI, CNRS UREC, DSI CNRS, RedIRIS, DANTE, SWITCH | ||
| Formalized participation of EGI Net Sup in PerfSONAR User Panel. Report (protected by GN3 wiki password: [https://intranet.geant.net/sites/Services/SA2/T3/Documents/Meetings%20and%20Calls/ST-GN3-20110215-SA2%20T3%20Feb%202011%20Poznan%20meeting%20minutes.docx] URL: [https://intranet.geant.net/sites/Services/SA2/T3/Meetings/SA2T3meetingFeb2011inPoznan/default.aspx | | Formalized participation of EGI Net Sup in PerfSONAR User Panel. Report (protected by GN3 wiki password: [https://intranet.geant.net/sites/Services/SA2/T3/Documents/Meetings%20and%20Calls/ST-GN3-20110215-SA2%20T3%20Feb%202011%20Poznan%20meeting%20minutes.docx] URL: [https://intranet.geant.net/sites/Services/SA2/T3/Meetings/SA2T3meetingFeb2011inPoznan/default.aspx] | ||
|- | |- |
Revision as of 10:06, 28 April 2011
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
QR4 | IGI | <NGI Country> | Paolo Veronesi |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
February 7-8, 2011 | Poznan | GN3 SA2 T3 kick Off Meeting | 10 on behalf of GARR IGI, CNRS UREC, DSI CNRS, RedIRIS, DANTE, SWITCH | Formalized participation of EGI Net Sup in PerfSONAR User Panel. Report (protected by GN3 wiki password: [1] URL: [2] |
April 7, 2011 | VCONF | Network Support update | 10 on behalf of GARR IGI, CNRS UREC, DSI CNRS, RedIRIS, DANTE, SWITCH | Defined long term strategy for Network Support coordination for EGI. Short Report: [3] |
April 11-15, 2011 | Vilnius | EGI UF | 6 | (1 demo, 1 poster, 1 talk, 2 booths);http://uf2011.egi.eu/ |
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
2.1.1. GARR
2.1.2. INFN
- Italian NGI (IGI) has been setup and the transition from ROC has been completed.
- Availability/Reliability: Feb (95%/97%), Mar (96%/97%) , Apr (NA).
- Site changes: GRISU-COMETA-UNICT-DIIT and GRISU-ENEA-GRID has been suspended on April for low availability and very long downtime period. The new site INFN-BOLOGNA-T3 has been certified on April.
2.2. Main Achievements
2.2.1. GARR
2.2.2. INFN
- The italian LFC service supports several VOs (argo, ams02.cern.ch, babar, bio, cdf, compchem, comput-er.it, superbvo.org, eticsproject.eu, enea, glast.org, gridit, inaf, infngrid, ingv, libi, pacs.infn.it, pamela, planck, theophys, tps.infn.it, virgo, euchina, enmr.eu, euindia, cyclops, compassit). The setup of this core service has been migrated to a high availability and fault tolerance configuration (two frontends and a dedicated server for the mysql backend, all checked via nagios).
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|