Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Italy-QR4"

From EGIWiki
Jump to navigation Jump to search
Line 30: Line 30:


===  ===
===  ===
{| border="1" cellspacing="0" style="font-size: 13px; color: black; background-color: white; margin-top: 0px; margin-right: 0px; margin-bottom: 0px; margin-left: 5px; "
|-
! scope="col" | Date
! Location
! Title
! Participants
! Outcome (Short report & Indico URL)
|}
===  ===
=== 1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED ===


{| border="1" cellspacing="0" style="font-size: 13px; color: black; background-color: white; margin-top: 0px; margin-right: 0px; margin-bottom: 0px; margin-left: 5px; "
{| border="1" cellspacing="0" style="font-size: 13px; color: black; background-color: white; margin-top: 0px; margin-right: 0px; margin-bottom: 0px; margin-left: 5px; "
Line 43: Line 58:
| EGI UF
| EGI UF
| 6
| 6
| (1 demo, 1 poster, 1 talk, 2 booths) <span class="Apple-style-span" style="line-height: 19px; ">[http://uf2011.egi.eu/ http://uf2011.egi.eu/]</span>
| (1 demo, 1 poster, 1 talk, 2 booths)&nbsp;[http://uf2011.egi.eu/ http://uf2011.egi.eu/]
|}
|}


===  ===


=== 1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED  ===


{| border="1" cellspacing="0"
 
|-
! scope="col" | Date
! Location
! Title
! Participants
! Outcome (Short report &amp; Indico URL) <!-- formatting text -->
|}


<!--
<!--
Line 83: Line 89:
===2.1. Progress Summary=== <!-- Provide your test below -->  
===2.1. Progress Summary=== <!-- Provide your test below -->  


====2.1.1. GARR====
==== 2.1.1. GARR ====


====2.1.2. INFN====
==== 2.1.2. INFN ====
 
*Italian NGI (IGI) has been setup and the transition from ROC has been completed.&nbsp;
*Availability/Reliability:&nbsp;Feb (95%/97%), Mar (96%/97%) , Apr (NA).&nbsp;
*Site changes:&nbsp;GRISU-COMETA-UNICT-DIIT and GRISU-ENEA-GRID has been suspended on April for low availability and very long downtime period. The new site INFN-BOLOGNA-T3 has been certified on April.
 
*


===2.2. Main Achievements=== <!--
===2.2. Main Achievements=== <!--
Line 91: Line 103:
-->  
-->  


====2.2.1. GARR====
==== 2.2.1. GARR ====
 
====2.2.2. INFN====


==== 2.2.2. INFN ====


*The italian LFC service supports several VOs (argo, ams02.cern.ch, babar, bio, cdf, compchem, comput-er.it, superbvo.org, eticsproject.eu, enea, glast.org, gridit, inaf, infngrid, ingv, libi, pacs.infn.it, pamela, planck, theophys, tps.infn.it, virgo, euchina, enmr.eu, euindia, cyclops, compassit). The setup of this core service has been migrated to a high availability and fault tolerance configuration (two frontends and a dedicated server for the mysql backend, all checked via nagios).


=== 2.3. Issues and mitigation  ===
=== 2.3. Issues and mitigation  ===

Revision as of 17:18, 27 April 2011


Quarterly Report Number NGI Name Partner Name Author
QR4 IGI <NGI Country> Paolo Veronesi


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
April 11-15, 2011 Vilnius EGI UF 6 (1 demo, 1 poster, 1 talk, 2 booths) http://uf2011.egi.eu/




1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

2.1.1. GARR

2.1.2. INFN

  • Italian NGI (IGI) has been setup and the transition from ROC has been completed. 
  • Availability/Reliability: Feb (95%/97%), Mar (96%/97%) , Apr (NA). 
  • Site changes: GRISU-COMETA-UNICT-DIIT and GRISU-ENEA-GRID has been suspended on April for low availability and very long downtime period. The new site INFN-BOLOGNA-T3 has been certified on April.

2.2. Main Achievements

2.2.1. GARR

2.2.2. INFN

  • The italian LFC service supports several VOs (argo, ams02.cern.ch, babar, bio, cdf, compchem, comput-er.it, superbvo.org, eticsproject.eu, enea, glast.org, gridit, inaf, infngrid, ingv, libi, pacs.infn.it, pamela, planck, theophys, tps.infn.it, virgo, euchina, enmr.eu, euindia, cyclops, compassit). The setup of this core service has been migrated to a high availability and fault tolerance configuration (two frontends and a dedicated server for the mysql backend, all checked via nagios).

2.3. Issues and mitigation

Issue Description Mitigation Description