Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Italy-QR3"

From EGIWiki
Jump to navigation Jump to search
Line 20: Line 20:


==1. MEETINGS AND DISSEMINATION ==
==1. MEETINGS AND DISSEMINATION ==
=====GENERAL GUIDELINES FOR ALL EVENTS REPORTED IN THE FOLLOWING SECTIONS:=====
<!--=====GENERAL GUIDELINES FOR ALL EVENTS REPORTED IN THE FOLLOWING SECTIONS:=====
*please do not provide a list of participants, only give the number of people that attended
*please do not provide a list of participants, only give the number of people that attended
*for outcome, please list tangible agreements, decisions instead of listing program points or presentations you made. Otherwise put: “-“
*for outcome, please list tangible agreements, decisions instead of listing program points or presentations you made. Otherwise put: “-“
Line 27: Line 27:
**If your presentation is not available online, please send the slides to erika.swiderski@egi.eu.  
**If your presentation is not available online, please send the slides to erika.swiderski@egi.eu.  
Note: Complete the tables below by adding as many rows as needed.  
Note: Complete the tables below by adding as many rows as needed.  
Note: Complete the tables below by adding as many rows as needed.  
Note: Complete the tables below by adding as many rows as needed. -->


===1.1. CONFERENCES/WORKSHOPS ORGANISED===
===1.1. CONFERENCES/WORKSHOPS ORGANISED===

Revision as of 18:04, 16 February 2011


Quarterly Report Number NGI Name Partner Name Author
QR3 IGI Italy luciano gaido


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
Jan 24, 2011 Amsterdam Network Support workshop 30 a proposal about the organization and services for netw support has been presented. Timetable: https://www.egi.eu/indico/conferenceTimeTable.py?confId=153#20110124
<Date> <Location> <Title> <Participants> <Outcome>
<Date> <Location> <Title> <Participants> Test

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
<Date> <Location> Title Participants Outcome
<Date> <Location> Title Participants Outcome
<Date> <Location> Title Participants Outcome Test


1.3. PUBLICATIONS

Publication title <Journal/Proceedings> Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?
A fault avoidance strategy improving the reliability of the EGI production grid infrastructure OPODIS 2010 Proceedings - 1.Francesco Palmieri
2.Silvio Pardi
3. Paolo Veronesi
<Publication title> <Journal/Proceedings> Vol:<volume number>
Issue:<Issue>
Pg: <from> - <to>
1.<Author 1>
2.<Author2>
3. <Author3>
<Publication title> <Journal/Proceedings> Vol:<volume number>
Issue:<Issue>
Pg: <from> - <to>
1.<Author 1>
2.<Author2>
3. <Author3>

2. ACTIVITY REPORT

2.1. Progress Summary

INFN-CNAF site has been EA for updtae07

INFN-PISA sited completed the setup of the computing resources (1000 cores) that have recently joined the site. They will be mainly used by the theophys community

A short tutorial for site admins has been organized in bologna (CNAF) on december 2nd.

Some italian NOC people contributed to the organization of the tutorial for site administrators held in Catania (December, 13-17).

The setup of the Comput-er regional VO has been completed.

Network Support:

A proposal for the organization of the network support has been presented at the Network Support workshop organized in Amsterdam on January, 24th.

Outcome:

A dedicated support unit for network problems within GGUS will be tested with GARR providing supporters. In addition all NRENs will be contacted to see if they want to provide a PERT contact. IGI (GARR) will continue developing HINTS, a tool for network troubleshooting on-demand. The Spanish NGI (REDIRIS) will continue developing DVD , a tool for e2e Multidomain monitoring, in collaboration with Geant/Dante. DownCollector packeging and documentation will be improved.

2.2. Main Achievements

Accounting:

A DGAS prototype implementing the ActiveMQ transport between the sensors(on the CE) and the accouting repository (the site HLR) has been succesfully tested.

2.3. Issues and mitigation

Issue Description Mitigation Description
Issue description Issue mitigation
The italian ROC has not been migrated to the Italian NGI (IGI) grid operations center yet. The IGI setup is ongoing and the ROC migration, that should be straightforward, is foreseen for the next quarter.