Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Italy-QR14"

From EGIWiki
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{Template:Op menubar}} {{Template:Inspire_reports_menubar}} {{TOC_right}}  
{{Template:EGI-Inspire menubar}}


<br>
{{Template:Inspire_reports_menubar}}
{{TOC_right}}


{| class="wikitable"
{| class="wikitable"
Line 125: Line 126:
|-
|-
| Issue Description || Issue mitigation
| Issue Description || Issue mitigation
-->  
-->
 
[[Category:NGI_QR_Reports]]

Latest revision as of 15:19, 7 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



Quarterly Report Number NGI Name Partner Name Author
QR14 NGI_IT Italy Paolo Veronesi


1. MEETINGS AND DISSEMINATION

Note: Complete the tables below by adding as many rows as needed.

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
September 16-20, 2013 Madrid EGI Technical Forum ~12 people from INFN https://indico.egi.eu/indico/conferenceDisplay.py?confId=1417


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1.1. GARR

2.1.2. INFN

Resource centers changes

  • suspended: GRISU-COMETA-INAF-CT, GRISU-COMETA-INFN-LNS, ISMB

IGI portal

  • Interfacing of the portal to a Dirac server, configured for multi VOs utilization, in order to submit job (normal, parametric and MPI) using the pilot job mechanism.
  • Improvement of the transfer files mechanism in Data Management section in order to move files form Grid SEs to user’s PC or remote servers using several protocols (FTP, SFTP, webDAV).

Security Follow up

  • critical vulnerability EGI-SVG-2013-5890 into 12 local affected sites
  • old critical vulnerabilities (eg. CVE-2013-2094) appearing into local sites as per 5.4.2 section of EGI-CSIRT Critical Vulnerability Operational Procedure document
  • EGI-20130909 security incident into local site

Training

  • partecipation to the training sessiones at the EGI Technical Forum

Central banning

  • Deployment of and NGI Argus and configuration for the interaction with both Central EGI and IGI-BOLOGNA Argus
  • Testing and validating aforementioned interaction

Ticketing

  • Routine maintenance of the italian ticketing system

CVMFS

  • Partecipation to EGI CVMFS Task Force
  • National squid service provided to all Italian sites
  • CVMFS stratum zero provided for the following VOs: superbvo, gridit, argo

2.2. Main Achievements

2.2.1. GARR

2.2.2. INFN

  • National squid service provided to all Italian sites
  • CVMFS stratum zero provided for the following VOs: superbvo, gridit, argo

2.3. Issues and mitigation

Issue Description Mitigation Description
Issue description Issue mitigation