Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Italy-QR12"

From EGIWiki
Jump to navigation Jump to search
Line 121: Line 121:
*  Study on the relation between the information published in the BDII by the different type of SEs. This study is helping the development of a sensor that write UR compatible with the StAR UR. Those record will be collected in the central accounting repository along with those for CPU accounting.
*  Study on the relation between the information published in the BDII by the different type of SEs. This study is helping the development of a sensor that write UR compatible with the StAR UR. Those record will be collected in the central accounting repository along with those for CPU accounting.


===2.2. Main Achievements=== <!--
===2.2. Main Achievements===  
Provide your text below
====2.1.1. GARR====
-->
 
====2.1.2. INFN====
* UR2.0 P-REC (Proposed Recommendation) is in public comment since the beginning of March.
* Migration to EMI-3 of all the installed WMSes.
* Migration to EMI-3 of all the installed Top-BDIIs.
* A web based Data Management utility is available to Grid users.
* Helpdesk activity for IGI and TPM has been performed.


=== 2.3. Issues and mitigation  ===
=== 2.3. Issues and mitigation  ===

Revision as of 10:45, 6 May 2013

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports




Quarterly Report Number NGI Name Partner Name Author
QR12 NGI_IT Italy Paolo Veronesi


1. MEETINGS AND DISSEMINATION

Note: Complete the tables below by adding as many rows as needed.

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
<Date> <Location> <Title> <Participants> <Outcome>

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
15-19 April 2013 Bologna, IT HEPIX 3 people http://indico.cern.ch/conferenceDisplay.py?ovw=True&confId=220443/
8-12 April 2013 Manchester, UK EGI Community Forum 10 people http://cf2013.egi.eu/
11-13 March 2013 Charlottesville, Virginia (US) OGF 37 1 people http://www.ogf.org/gf/event_schedule/index.php?event_id=28, Presentation of the UR2.0 P-REC (Proposed Recommendation).


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?
<Publication title> <Journal/Proceedings> Vol:<volume number>
Issue:<Issue>
Pg: <from> - <to>
1.<Author 1>
2.<Author2>
3. <Author3>
<Publication title> <Journal/Proceedings> Vol:<volume number>
Issue:<Issue>
Pg: <from> - <to>
1.<Author 1>
2.<Author2>
3. <Author3>
<Publication title> <Journal/Proceedings> Vol:<volume number>
Issue:<Issue>
Pg: <from> - <to>
1.<Author 1>
2.<Author2>
3. <Author3>

2. ACTIVITY REPORT

2.1. Progress Summary

2.1.1. GARR

2.1.2. INFN

Migration activity

  • Top-BDII services provided by NGI_IT have been upgraded to EMI-3.
  • WMS servers managed by NGI_IT were upgraded to EMI-3

Resource centers changes

  • certified: FBF-Brescia-IT (new site), INFN-NAPOLI-ARGO and INFN-NAPOLI-PAMELA (back in production)
  • suspended: BIOCOMP
  • closed: CESIC-UNICAL

IGI portal

  • We have developed an interface for the cloud solution that cooperate with WNoDes OpenStack and OpenNebula.
  • The Data Management plugin for the IGI Portal has been improved. It's now possible to download data from Grid to an external server. Several improvements in the web interface have been provided and some bug have been fixed. We are studying the possibility to move data between Grid and Cloud storage and the integration of a metadata catalogue.
  • We are working on DIRAC solution integration in the Portal.
  • We are working on some interfaces for new specific applications.

Security

  • SAM II level support on duty weeks.
  • ARGUS EMI3 early adopter deployment.
  • Follow up and fixing issues on both security dashboard and nagios for local NGi site.

Ticketing

  • Routine maintenance of the italian ticketing system

Accounting

  • Study on the relation between the information published in the BDII by the different type of SEs. This study is helping the development of a sensor that write UR compatible with the StAR UR. Those record will be collected in the central accounting repository along with those for CPU accounting.

2.2. Main Achievements

2.1.1. GARR

2.1.2. INFN

  • UR2.0 P-REC (Proposed Recommendation) is in public comment since the beginning of March.
  • Migration to EMI-3 of all the installed WMSes.
  • Migration to EMI-3 of all the installed Top-BDIIs.
  • A web based Data Management utility is available to Grid users.
  • Helpdesk activity for IGI and TPM has been performed.

2.3. Issues and mitigation

Issue Description Mitigation Description
Issue description Issue mitigation