Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Ireland-QR5"

From EGIWiki
Jump to navigation Jump to search
 
(15 intermediate revisions by 2 users not shown)
Line 1: Line 1:
__NOTOC__
{{Template:EGI-Inspire menubar}}
 
{{Template:Inspire_reports_menubar}}
{{TOC_right}}
{| border="1" cellspacing="0" cellpadding="2"
{| border="1" cellspacing="0" cellpadding="2"
|-
|-
Line 78: Line 81:


===2.1. Progress Summary===
===2.1. Progress Summary===
* NGI_IE became Operational
** Some delays because of problems with the Operational Tools and the proposed UK/I model.
* Progressed Quattor QWG upgrade and related middleware upgrade
* Progressed Quattor QWG upgrade and related middleware upgrade


===2.2. Main Achievements===
===2.2. Main Achievements===
* Participated in EGI CSIRT, including security challenge (SSC5) and monthly meetings
* Participated in EGI CSIRT, including security challenge (SSC5) and monthly meetings
* glite-MPI Early Adapter
* UMD glite-MPI Early Adapter
* Included installing EMI EA WMS and LB (some GridSite GACL) problems seen with WMProxy
** Included installing EMI EA WMS and LB (some GridSite GACL) problems seen with WMProxy
* Integration of a 32 GPU (16 Node x 2 GPU) cluster
** Hybrid SL6 + gLite 3.2 Tarball installation + Quattor configuration
** Some issues remain with Torque/Maui support for GPUs
* Integration of 16 Sony Playstation nodes
** A initial full 6 months of dedicated usage is expected


===2.3. Issues and mitigation===
===2.3. Issues and mitigation===
Line 92: Line 102:
!scope="col"| Mitigation Description
!scope="col"| Mitigation Description
|-
|-
|
| Operations Tools caused some problems for creation and announcement of NGI structure  || Solved by Monitoring Team
|-
| Availabilty/Reliabilty figures missing for April, May, June || Requested recalculation
|-
|-
| Operations Tools caused some problems for NGI structure  || Solved by Monitoring Team
| Known issue with ARC + MyProxy causing delay on creation/integration of a new site ||
|-
|-
| Availabilty/Reliabilty figures missing for April and May || Requested recalculation
| Some Grid jobs using all resources on worker nodes (users jobs not checking resource usage, uses all memory and fills disk). Negative effect on all other users jobs || Banned both users and raised GGUS ticket
}


<!--
<!--

Latest revision as of 18:45, 22 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



Quarterly Report Number NGI Name Partner Name Author
QR5 NGI_IE TCD John Walsh, David O'Callaghan


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
2011-05-11–2011-05-13 Nikhef, Amsterdam, NL EGI User Virtualization Workshop 72, 1 from TCD https://www.egi.eu/indico/conferenceDisplay.py?confId=415
2011-06-09–2011-06-10 CERN, Geneva, CH Federated Identity System for Scientific Collaborations 85, 1 from TCD https://indico.cern.ch/conferenceDisplay.py?ovw=True&confId=129364


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

  • NGI_IE became Operational
    • Some delays because of problems with the Operational Tools and the proposed UK/I model.
  • Progressed Quattor QWG upgrade and related middleware upgrade

2.2. Main Achievements

  • Participated in EGI CSIRT, including security challenge (SSC5) and monthly meetings
  • UMD glite-MPI Early Adapter
    • Included installing EMI EA WMS and LB (some GridSite GACL) problems seen with WMProxy
  • Integration of a 32 GPU (16 Node x 2 GPU) cluster
    • Hybrid SL6 + gLite 3.2 Tarball installation + Quattor configuration
    • Some issues remain with Torque/Maui support for GPUs
  • Integration of 16 Sony Playstation nodes
    • A initial full 6 months of dedicated usage is expected

2.3. Issues and mitigation

Issue Description Mitigation Description
Operations Tools caused some problems for creation and announcement of NGI structure Solved by Monitoring Team
Availabilty/Reliabilty figures missing for April, May, June Requested recalculation
Known issue with ARC + MyProxy causing delay on creation/integration of a new site
Some Grid jobs using all resources on worker nodes (users jobs not checking resource usage, uses all memory and fills disk). Negative effect on all other users jobs Banned both users and raised GGUS ticket