Difference between revisions of "EGI-InSPIRE:Ireland-QR3"
Jump to navigation
Jump to search
m (moved Ireland-QR3 to EGI-InSPIRE:Ireland-QR3) |
|||
(8 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
{{Template:EGI-Inspire menubar}} | |||
{{Template:Inspire_reports_menubar}} | |||
{{TOC_right}} | |||
{| border="1" cellspacing="0" cellpadding="2" | {| border="1" cellspacing="0" cellpadding="2" | ||
Line 20: | Line 23: | ||
==1. MEETINGS AND DISSEMINATION == | ==1. MEETINGS AND DISSEMINATION == | ||
=====GENERAL GUIDELINES FOR ALL EVENTS REPORTED IN THE FOLLOWING SECTIONS:===== | <!--=====GENERAL GUIDELINES FOR ALL EVENTS REPORTED IN THE FOLLOWING SECTIONS:===== | ||
*please do not provide a list of participants, only give the number of people that attended | *please do not provide a list of participants, only give the number of people that attended | ||
*for outcome, please list tangible agreements, decisions instead of listing program points or presentations you made. Otherwise put: “-“ | *for outcome, please list tangible agreements, decisions instead of listing program points or presentations you made. Otherwise put: “-“ | ||
Line 27: | Line 30: | ||
**If your presentation is not available online, please send the slides to erika.swiderski@egi.eu. | **If your presentation is not available online, please send the slides to erika.swiderski@egi.eu. | ||
Note: Complete the tables below by adding as many rows as needed. | Note: Complete the tables below by adding as many rows as needed. | ||
Note: Complete the tables below by adding as many rows as needed. | Note: Complete the tables below by adding as many rows as needed. --> | ||
===1.1. CONFERENCES/WORKSHOPS ORGANISED=== | ===1.1. CONFERENCES/WORKSHOPS ORGANISED=== | ||
Line 37: | Line 40: | ||
!scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL) | !scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL) | ||
|- | |- | ||
<!-- formatting_test --> | <!-- formatting_test --> | ||
|- | |- | ||
Line 76: | Line 74: | ||
|- | |- | ||
!scope="col"|Publication title||Journal / Proceedings title||align="left" |Journal references<br> ''Volume number<br> Issue<br><br>Pages from - to''||align="left" |Authors ''<br>1.<br>2.<br>3.<br>Et al?'' | !scope="col"|Publication title||Journal / Proceedings title||align="left" |Journal references<br> ''Volume number<br> Issue<br><br>Pages from - to''||align="left" |Authors ''<br>1.<br>2.<br>3.<br>Et al?'' | ||
|} | |} | ||
Line 98: | Line 90: | ||
--> | --> | ||
* Record number of CPU hours recorded on during all three months at csTCDie, csUCCie and scgNUIGie. | |||
* Support more international VOs at csUCCie (biomed) and NUIG (astro). | |||
* Availability and Reliability statistics for November, December and January were excellent (despite miscellaneous security updates and subsequent deployment). | |||
* CA self-audit report and feedback from EU Grid PMA reviewers | |||
* Migration to glite-APEL | |||
===2.3. Issues and mitigation=== | ===2.3. Issues and mitigation=== |
Latest revision as of 18:46, 22 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
QR3 | NGI-IE | Ireland | John Walsh |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
9/Nov/2010 | Dublin, Ireland | e-INIS all-hands | 3 | Presentations about Grid-Ireland status and plans |
12/Jan/2011-13/Jan/2011 | Amsterdam, Netherlands | EGI Security Policy Group | 1 | http://www.nikhef.nl/grid/meetings/spg2011/ |
24/Jan/2011-25/Jan/2011 | Amsterdam, Netherlands | OMB face to face | 1 | https://www.egi.eu/indico/conferenceDisplay.py?confId=153 |
25/Jan/2011 | Amsterdam, Netherlands | OTAG | 1 | https://www.egi.eu/indico/conferenceDisplay.py?confId=245 |
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
- Fully commissioned a redundant 10Gb link (with failover) from OpsCentre to Main Campus to NREN.
- Grid-Ireland started the process of creating the operational structure NGI_IE.
- Deployment of National UI (gLite 3.2)
2.2. Main Achievements
- Record number of CPU hours recorded on during all three months at csTCDie, csUCCie and scgNUIGie.
- Support more international VOs at csUCCie (biomed) and NUIG (astro).
- Availability and Reliability statistics for November, December and January were excellent (despite miscellaneous security updates and subsequent deployment).
- CA self-audit report and feedback from EU Grid PMA reviewers
- Migration to glite-APEL
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|---|
gLite 3.1 to gLite 3.2 migration making slow progress | Migration handled by Quattor, some services not available |
Power issues (overloading of UPS) at scgNUIGie in January required shutdown of 12 dual-core nodes | Have deployed an additional 24-core SMP unit |
NFS issues at csTCDie (vendor supplied solution related) resulted in long running jobs failing at last stage of job management | split load over 4 servers, increased default timeouts and retries, forced restart of lower level services |
Weaknessess in globus cleanup script (over NFS) | Writing script to clean old files |
csTCDie is still waiting on production ready glite-CLUSTER node type to integrate Ubuntu and PS3 nodes | |
VO dashboard information is sometimes not updated. Quattor sites depend on up-to-date information, thus recent issues seen with move of DTEAM to NGI-GR | |
Detected problem with Nagios MPI sensor at csUCCie | Problem fixed by EGI Nagios tools group |