Difference between revisions of "EGI-InSPIRE:Ireland-QR10"
Jump to navigation
Jump to search
Line 79: | Line 79: | ||
===2.1. Progress Summary=== | ===2.1. Progress Summary=== | ||
* CA | |||
** Testing of IPv6 and OCSP support. Initial work on SHA-2 support. | |||
** CA policy updates | |||
* Began decommissioning procedure for all NGI_IE sites | |||
** cpDIASie, csUCCie, giNUIMie, mpUCDie entered the procedure in September, and reached the "suspended" state in mid-October | |||
** csTCDie entered the procedure on 1 October and were in downtime at 31 October. This will end 12 November. | |||
** scgNUIGie was already suspended and has now been closed | |||
** several further non-EGI-certified sites have been or will soon be decommissioned | |||
** Arranging for international VOs to be migrated to other NGIs | |||
* CSIRT | |||
** attended monthly meetings. Duty contact. | |||
===2.2. Main Achievements=== | ===2.2. Main Achievements=== | ||
* Several abstracts accepted for EGI TF | |||
Revision as of 18:32, 1 November 2012
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
10 | NGI_IE | TCD | David O'Callaghan |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
10-12 September 2012 | Lyon, France | 26th EU Grid PMA meeting | 27 | https://agenda.nikhef.nl/conferenceTimeTable.py?confId=2083
|
17-21 September 2012 | Prague, Czech Republic | EGI TF 2012 | - | https://indico.egi.eu/indico/conferenceTimeTable.py?confId=1019#20120917
|
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
- CA
- Testing of IPv6 and OCSP support. Initial work on SHA-2 support.
- CA policy updates
- Began decommissioning procedure for all NGI_IE sites
- cpDIASie, csUCCie, giNUIMie, mpUCDie entered the procedure in September, and reached the "suspended" state in mid-October
- csTCDie entered the procedure on 1 October and were in downtime at 31 October. This will end 12 November.
- scgNUIGie was already suspended and has now been closed
- several further non-EGI-certified sites have been or will soon be decommissioned
- Arranging for international VOs to be migrated to other NGIs
- CSIRT
- attended monthly meetings. Duty contact.
2.2. Main Achievements
- Several abstracts accepted for EGI TF
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|