Difference between revisions of "EGI-InSPIRE:Ireland-QR10"
Jump to navigation
Jump to search
m (moved Ireland-QR10 to OMB:Ireland-QR10) |
|||
(3 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Template:EGI-Inspire menubar}} | |||
{{Template:Inspire_reports_menubar}} | |||
{{TOC_right}} | |||
{| border="1" cellspacing="0" cellpadding="2" | {| border="1" cellspacing="0" cellpadding="2" | ||
|- | |- | ||
Line 93: | Line 95: | ||
===2.2. Main Achievements=== | ===2.2. Main Achievements=== | ||
* Several abstracts accepted for EGI TF | * Several abstracts accepted for EGI TF | ||
* Decommissioning of sites has proceeded smoothly | |||
===2.3. Issues and mitigation=== | ===2.3. Issues and mitigation=== |
Latest revision as of 16:13, 7 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
10 | NGI_IE | TCD | David O'Callaghan |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
10-12 September 2012 | Lyon, France | 26th EU Grid PMA meeting | 27 | https://agenda.nikhef.nl/conferenceTimeTable.py?confId=2083
|
17-21 September 2012 | Prague, Czech Republic | EGI TF 2012 | - | https://indico.egi.eu/indico/conferenceTimeTable.py?confId=1019#20120917
|
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
- CA
- Testing of IPv6 and OCSP support. Initial work on SHA-2 support.
- CA policy updates
- Began decommissioning procedure for all NGI_IE sites
- cpDIASie, csUCCie, giNUIMie, mpUCDie entered the procedure in September, and reached the "suspended" state in mid-October
- csTCDie entered the procedure on 1 October and were in downtime at 31 October. This will end 12 November.
- scgNUIGie was already suspended and has now been closed
- several further non-EGI-certified sites have been or will soon be decommissioned
- Arranging for international VOs to be migrated to other NGIs
- CSIRT
- attended monthly meetings. Duty contact.
2.2. Main Achievements
- Several abstracts accepted for EGI TF
- Decommissioning of sites has proceeded smoothly
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|