Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

EGI-InSPIRE:Ibergrid-QR9

From EGIWiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



Quarterly Report Number NGI Name Partner Name Author
QR9 Ibergrid LIP & CSIC Pablo Orviz (CSIC), Esteban Freire García (CSIC)


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
16th May Madrid, Spain LDAP, Security Policies 30
16th May Madrid, Spain Proyecto IMED: desarrollo y resultados. Explotación de e-Infraestructuras para la investigación en el diagnóstico de cáncer de mama 2
6-7 June Valencia, Spain Master course on LDAP 7
18-26 June México Joint CHAIN/GISELA/EPIKH School for Application Porting to Science 1
27-29 June México Developing a portlet for the GISELA Science Gateway to process hyperspectral images 1
27-29 June México Clarabox: A platform to manage easily Grid storage 1
27-29 June México The IMED project: first results - Exploiting e-infrastructures for research in breast cancer CAD methods 1

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
16th May Madrid, Spain 6ª Reunión Plenaria de la Red Española de e-Ciencia 5
21-25 May New York, USA Computing in High Energy Physics 2012 2
7th June Barcelona DIRAC tutorial 1
25-27 June Liverpool, UK 14th IEEE International Conference on High Performance Computing and Communications (HPCC-2012) 2
  • CIEMAT-LCG2 - Evaluation of the Broadcast Operation in Kademlia
27-29 June México Joint CHAIN/GISELA/EPIKH School for Application Porting to Science 1
3-4 July Samos (Greece) 2nd e-Fiscal Workshop 2
  • IFAE - Attendance to the workshop of the e-fiscal EU project. Collaborating in the study of the cost of research e-infrastructures carried out by this project. http://www.efiscal.eu/2nd-workshop
  • IFISC
2-6 July Budapest, Hungary SCI-BUS, SHIWA, EDGI joint Summer School on Workflows and Gateways for Grids and Clouds 1
3-4 July México Joint CHAIN/GISELA/EPIKH School for Application Porting to Science 1
12-13 July NIKHEF, Science Park, Amsterdam Netherlands EGI Federated Cloud Task Force user Plugfest 1


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?
Paper: The IMED project: first results - Exploiting e-infrastructures for research in breast cancer CAD methods Proceedings of the Joint GISELA-CHAIN Conference. COMETA 2012 http://indico.ceta-ciemat.es//subContributionDisplay.py?subContId=3&contribId=6&sessionId=0&confId=26 Guillermo Diaz, Jose Miguel Franco, Cesar Suarez et al
Paper: Clarabox: A platform to manage easily Grid storage Proceedings of the Joint GISELA-CHAIN Conference. COMETA 2012 http://indico.ceta-ciemat.es//subContributionDisplay.py?subContId=3&contribId=13&sessionId=1&confId=26 Cesar Suarez, Jose Miguel Franco, Guillermo Diaz
Paper: Developing a portlet for the GISELA Science Gateway to process hyperspectral images Proceedings of the Joint GISELA-CHAIN Conference http://indico.ceta-ciemat.es//subContributionDisplay.py?subContId=9&contribId=17&sessionId=2&confId=26 Sara García, Jose Miguel Franco, Cesar Suarez Et al.


2. ACTIVITY REPORT

2.1. Progress Summary

  1. Evaluation of DIRAC tool to be deployed within the Ibergrid infrastructure.
  2. Last integration steps and testing of RT helpdesk with central GGUS interface.
  3. Ibergrid sites publishing userDN information for their accounting records.
  4. Collaborating in writing a site renaming procedure draft to be used generally, https://wiki.egi.eu/wiki/Draft_PROC
  5. Provide comments to the VO decommission procedure, https://wiki.egi.eu/wiki/PROC13draft
  6. It has been run some training Security incidents in some of the IBERGRID sites, in order to teach them how to react in case of some fail security.

2.2. Main Achievements

  1. 100% A/R in May, June and July 2012 for the TopBDII service (after the implementation of the TopBDII HA mechanism).

2.3. Issues and mitigation

Issue Description Mitigation Description
There was an issue related with the Ibergrid Regional Nagios:
  • There was an external issue related with the network at CESGA which affected to the Ibergrid Regional Nagios. The incident had place on Saturday 9th June, and lasted to Monday 11th June. GGUS ticket #83124 was open in order to do not take into account that period in the A/R metrics.
Re-computation already processed and ticket is closed and verified.
WMSs used for Nagios checks hit by high risk vulnerability EGI-SVG-2012-4039. Emergency update being applied