Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Ibergrid-QR8"

From EGIWiki
Jump to navigation Jump to search
Line 66: Line 66:
|-
|-
|26-30 March||Garching, Munich||EGI Community Forum 2012||~ 19||  
|26-30 March||Garching, Munich||EGI Community Forum 2012||~ 19||  
* Participation from several IBERGRID institutes with contributions in different sessions.
* Participation from several IBERGRID institutes with contributions in different sessions:
* BIFI-UNIZAR: Gateways development and relationships with SCI-BUS project.
* BIFI-UNIZAR: Gateways development and relationships with SCI-BUS project.
* CESGA: Contribution with the sessions "MPI in EGI", https://www.egi.eu/indico/contributionDisplay.py?contribId=220&confId=679 , and "Hybrid Cloud-based Grid Infraestructure: Experience & Future", https://www.egi.eu/indico/contributionDisplay.py?contribId=77&confId=679
* CESGA: Contribution with the sessions "MPI in EGI", https://www.egi.eu/indico/contributionDisplay.py?contribId=220&confId=679 , and "Hybrid Cloud-based Grid Infraestructure: Experience & Future", https://www.egi.eu/indico/contributionDisplay.py?contribId=77&confId=679

Revision as of 09:58, 2 May 2012

_NOTOC__

Quarterly Report Number NGI Name Partner Name Author
QR8 Ibergrid LIP & CSIC Álvaro Simón García, Esteban Freire García (CSIC)


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)


1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
28-Jan to 1-Feb LBL Berkeley (USA) LHCOPN and LHCONE joint meeting 1
  • ifae/pic: Follow up of activities of the networking group for the LHC. The architecture of the new LHCONE dedicated network extended to Tier2s is being decided now.

https://indico.cern.ch/conferenceDisplay.py?confId=160533

13-14 February Brussels Cloud Scape IV 2
15th February EVO meeting EGI Security Threat Risk Assessment meeting 2
23th March EVO meeting EGI Security Threat Risk Assessment meeting 2
  • RedIRIS: The main aim of this meeting was to finalize the list of threats as much as possible and decide how to further proceed.
26-30 March Garching, Munich EGI Community Forum 2012 ~ 19
10-13 April Bern EuroSys 2012 1
17-19 April DESY, Zeuthen (Germany) 6th International dCache Workshop 3
20th April EVO meeting EGI Security Assessment group meeting 2
  • RedIRIS: The main aim of this meeting was to discuss threats with deviating opinion on risk and plans for final report.
23-24 April Bologna EGI-CSIRT Face to Face meeting 1
  • RedIRIS: Review of the actions and task force which EGI-CSIRT is involved, besides a couple of hands-on were given during the meeting, one about forensic analysis and the second one about handling incidents using RTIR.

https://www.egi.eu/indico/conferenceTimeTable.py?confId=812.

23-27 April Prague HEPIX Spring 2012 Workshop 1
  • ifae/pic: Contribution “PIC Site Report” and attendance to the whole HEPIX workshop.

https://indico.cern.ch/contributionDisplay.py?contribId=16&sessionId=1&confId=160737

25 April CERN Many-core architectures for LHCb 1
  • ifae/pic: Follow-up of the LHC experiment software framework evolution to make efficient use of many core processor architectures.

https://indico.cern.ch/conferenceDisplay.py?confId=184092


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?
DRI: Data and Job Management on the Grid EGI Community Forum 2012 (26-30 March 2012). Poster. http://cf2012.egi.eu/exhibition/posters_and_demos.html José Miguel Franco Valiente, César Suárez Ortega, Manuel Rubio Del Solar, Jorge Sevilla Cedillo
Web Interface for Generic Grid Jobs Computing and informatics Vol 31, 2012, No.1 p173-186 Antònia Tugores, Pere Colet


2. ACTIVITY REPORT

2.1. Progress Summary

  1. LCMAPS message report sent to SA1 coordinators, and introduced in RT ticket: https://rt.egi.eu/rt/Ticket/Display.html?id=1983
  2. Internal survey to the Ibergrid sites about evaluation of the quality of services and tools at disposal of the site administrators. Analysis and discussion of the survey results in the weekly Ibergrid Operations meeting.
  3. New operations Wiki: http://ibergrid.lip.pt.
  4. Analysis of the 1st EGI review report.
  5. Push sites to implement VOMS redundancy for the Ibegrid VOs
  6. Implementation of the TopBDII HA proposal in NGI_IBERGRID. Process is being tracked via GGUS ticket: https://ggus.eu/ws/ticket_info.php?ticket=74883

2.2. Main Achievements

  1. Two new sites were joined to the infrastructure: ARAGRID-CIENCIAS and RC-GISELA-CETA.
  2. It has been installed a dedicated WMS to support the Ibergrid VOs.

2.3. Issues and mitigation

Issue Description Mitigation Description
UOGRID site is still suspended. This site entering in suspension status after 1 month of downtime during the last QR5.
There was several issues related with the Ibergrid Regional Nagios:
  • There was an external issue related with the connection between RedIris and the Galicia centers), which affected to the Ibergrid Regional Nagios. The incident had place on 08/09/2011, and it took from 01:00 AM CEST to 13:00 PM CEST. GGUS ticket #74146 was open in order to do not take into account that period in the A/R metrics.
  • There was an external issue related with the top-bdii configured in the R-Nagios, which affected to the Ibergrid Regional Nagios. The incident had place on 19/09/2011, and it took from 22:00 PM CEST to 12:00 AM CEST (20/09/2011). GGUS ticket #74652 was open in order to do not take into account that period in the A/R metrics.
  • It was necessary to reinstall the Ibergrid Regional Nagios, due to an issue related with the Mysql. GGUS ticket #75701 was open in order to do not take into account that period in the A/R metrics.