Difference between revisions of "EGI-InSPIRE:Ibergrid-QR8"
Jump to navigation
Jump to search
Line 66: | Line 66: | ||
|- | |- | ||
|26-30 March||Garching, Munich||EGI Community Forum 2012||~ 19|| | |26-30 March||Garching, Munich||EGI Community Forum 2012||~ 19|| | ||
* Participation from several IBERGRID institutes with contributions in different sessions | * Participation from several IBERGRID institutes with contributions in different sessions: | ||
* BIFI-UNIZAR: Gateways development and relationships with SCI-BUS project. | * BIFI-UNIZAR: Gateways development and relationships with SCI-BUS project. | ||
* CESGA: Contribution with the sessions "MPI in EGI", https://www.egi.eu/indico/contributionDisplay.py?contribId=220&confId=679 , and "Hybrid Cloud-based Grid Infraestructure: Experience & Future", https://www.egi.eu/indico/contributionDisplay.py?contribId=77&confId=679 | * CESGA: Contribution with the sessions "MPI in EGI", https://www.egi.eu/indico/contributionDisplay.py?contribId=220&confId=679 , and "Hybrid Cloud-based Grid Infraestructure: Experience & Future", https://www.egi.eu/indico/contributionDisplay.py?contribId=77&confId=679 |
Revision as of 09:58, 2 May 2012
_NOTOC__
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
QR8 | Ibergrid | LIP & CSIC | Álvaro Simón García, Esteban Freire García (CSIC) |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
28-Jan to 1-Feb | LBL Berkeley (USA) | LHCOPN and LHCONE joint meeting | 1 |
|
13-14 February | Brussels | Cloud Scape IV | 2 |
|
15th February | EVO meeting | EGI Security Threat Risk Assessment meeting | 2 |
|
23th March | EVO meeting | EGI Security Threat Risk Assessment meeting | 2 |
|
26-30 March | Garching, Munich | EGI Community Forum 2012 | ~ 19 |
|
10-13 April | Bern | EuroSys 2012 | 1 |
|
17-19 April | DESY, Zeuthen (Germany) | 6th International dCache Workshop | 3 |
|
20th April | EVO meeting | EGI Security Assessment group meeting | 2 |
|
23-24 April | Bologna | EGI-CSIRT Face to Face meeting | 1 |
https://www.egi.eu/indico/conferenceTimeTable.py?confId=812. |
23-27 April | Prague | HEPIX Spring 2012 Workshop | 1 |
https://indico.cern.ch/contributionDisplay.py?contribId=16&sessionId=1&confId=160737 |
25 April | CERN | Many-core architectures for LHCb | 1 |
|
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|---|---|---|
DRI: Data and Job Management on the Grid | EGI Community Forum 2012 (26-30 March 2012). Poster. | http://cf2012.egi.eu/exhibition/posters_and_demos.html | José Miguel Franco Valiente, César Suárez Ortega, Manuel Rubio Del Solar, Jorge Sevilla Cedillo |
Web Interface for Generic Grid Jobs | Computing and informatics | Vol 31, 2012, No.1 p173-186 | Antònia Tugores, Pere Colet |
2. ACTIVITY REPORT
2.1. Progress Summary
- LCMAPS message report sent to SA1 coordinators, and introduced in RT ticket: https://rt.egi.eu/rt/Ticket/Display.html?id=1983
- Internal survey to the Ibergrid sites about evaluation of the quality of services and tools at disposal of the site administrators. Analysis and discussion of the survey results in the weekly Ibergrid Operations meeting.
- New operations Wiki: http://ibergrid.lip.pt.
- Analysis of the 1st EGI review report.
- Push sites to implement VOMS redundancy for the Ibegrid VOs
- Implementation of the TopBDII HA proposal in NGI_IBERGRID. Process is being tracked via GGUS ticket: https://ggus.eu/ws/ticket_info.php?ticket=74883
2.2. Main Achievements
- Two new sites were joined to the infrastructure: ARAGRID-CIENCIAS and RC-GISELA-CETA.
- It has been installed a dedicated WMS to support the Ibergrid VOs.
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|---|
UOGRID site is still suspended. | This site entering in suspension status after 1 month of downtime during the last QR5. |
There was several issues related with the Ibergrid Regional Nagios:
|