Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

EGI-InSPIRE:Ibergrid-QR6

From EGIWiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



Quarterly Report Number NGI Name Partner Name Author
QR6 Ibergrid LIP & CSIC Álvaro Simón García, Esteban Freire García (CSIC)


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)


1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
19-23 September Lyon, France EGI Technical Forum 2011 ~ 15
12-16 September Lisbon, Portugal Timbus F2F meeting 5
  • LIP-Lisbon: Presentation of LIP-Lisbon activity in the EGI framework in the TIMBUS F2F activity. TIMBUS project home page: http://timbusproject.net/
19-23 September Santander XXXIII Bienal de la Real Sociedad Española de Física 2 “Aplicaciones de Física utilizando la Infraestructura de e-Ciencia del IFIC” http://indico.ific.uv.es/indico/materialDisplay.py?contribId=0&materialId=paper&confId=418
26-27 Sep Amsterdam LHCOPN-LHCONE joint meeting 1
  • IFAE: Reports on the status of LHCOPN and LHCONE infrastructures. Emphasis on the monitoring tools for LHCOPN such as Perfsonar-PS and also in the deployment of the new infrastructure for Tier2s LHCONE.

http://indico.cern.ch/conferenceOtherViews.py?view=standard&confId=149042

12 October Cern, Switzerland Staged Rollout Process 1
13-14 October Barcelona HPC SysAdmin Meeting'11 1
  • IFAE: Presentation on the use of Puppet at PIC as a tool for services configuration automation and management.

http://hpc.xrqtc.org/index.php/conference-training/anual-meeting


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?
OCDgLite. An easy way to deploy a customized gLite grid environment EGI Technical Forum 2011 (19-23 September). Poster. Jesús Santisteban, Miguel Angel Díaz, Manuel Enrique Cotallo
Despliegue auto-adaptativo e inteligente de aplicaciones grid basado en la Búsqueda de Entorno Variable VIII Congreso español sobre metaheuristicas, algoritmos evolutivos y bioinspirados - Conference María Botón-Fernández, Miguel A. Vega-Rodríguez, Francisco Prieto Castrillo
Modelo de despliegue auto-adaptativo en entornos grid desde las perspectiva de los sistemas complejos VIII Congreso español sobre metaheuristicas, algoritmos evolutivos y bioinspirados - Conference María Botón-Fernández, Francisco Prieto Castrillo, Miguel A. Vega-Rodríguez
Self-Adaptive and Intelligent Deployment of Grid Applications Based on Several Perspectives from the Artificial Intelligence Field Applied Soft Computing (Elsevier) - Journal María Botón-Fernández, Miguel A. Vega-Rodríguez, Francisco Prieto Castrillo


2. ACTIVITY REPORT

2.1. Progress Summary

  1. LCMAPS message report sent to SA1 coordinators, and introduced in RT ticket: https://rt.egi.eu/rt/Ticket/Display.html?id=1983
  2. Internal survey to the Ibergrid sites about evaluation of the quality of services and tools at disposal of the site administrators. Analysis and discussion of the survey results in the weekly Ibergrid Operations meeting.
  3. New operations Wiki: http://ibergrid.lip.pt.
  4. Analysis of the 1st EGI review report.
  5. Push sites to implement VOMS redundancy for the Ibegrid VOs
  6. Implementation of the TopBDII HA proposal in NGI_IBERGRID. Process is being tracked via GGUS ticket: https://ggus.eu/ws/ticket_info.php?ticket=74883

2.2. Main Achievements

  1. Two new sites were joined to the infrastructure: ARAGRID-CIENCIAS and RC-GISELA-CETA.
  2. It has been installed a dedicated WMS to support the Ibergrid VOs.

2.3. Issues and mitigation

Issue Description Mitigation Description
UOGRID site is still suspended. This site entering in suspension status after 1 month of downtime during the last QR5.
There was several issues related with the Ibergrid Regional Nagios:
  • There was an external issue related with the connection between RedIris and the Galicia centers), which affected to the Ibergrid Regional Nagios. The incident had place on 08/09/2011, and it took from 01:00 AM CEST to 13:00 PM CEST. GGUS ticket #74146 was open in order to do not take into account that period in the A/R metrics.
  • There was an external issue related with the top-bdii configured in the R-Nagios, which affected to the Ibergrid Regional Nagios. The incident had place on 19/09/2011, and it took from 22:00 PM CEST to 12:00 AM CEST (20/09/2011). GGUS ticket #74652 was open in order to do not take into account that period in the A/R metrics.
  • It was necessary to reinstall the Ibergrid Regional Nagios, due to an issue related with the Mysql. GGUS ticket #75701 was open in order to do not take into account that period in the A/R metrics.