Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Ibergrid-QR4"

From EGIWiki
Jump to navigation Jump to search
 
(13 intermediate revisions by 2 users not shown)
Line 1: Line 1:
__NOTOC__
{{Template:EGI-Inspire menubar}}


{{Template:Inspire_reports_menubar}}
{{TOC_right}}
{| border="1" cellspacing="0" cellpadding="2"
{| border="1" cellspacing="0" cellpadding="2"
|-
|-
Line 42: Line 44:
-->
-->
|-
|-
|<Date>||<Location>||<Title>||<Participants>||<Outcome>
|14th April||Vilnius, Luthuania||MPI hands on training||~10||
* IFCA: Training organized during the EGI user Forum for users interested in using MPI in the infrastrucuture; https://www.egi.eu/indico/contributionDisplay.py?contribId=35&sessionId=12&confId=207
|}
|}


Line 53: Line 56:
<!-- formatting text -->
<!-- formatting text -->
|-
|-
|11-14 April||Vilnius, Lithuania||EGI User Forum 2011||3||http://uf2011.egi.eu/
|14-16 April||Ljubljiana, Slovenia||ICANNGA, LNCS (Springer) ||1||
* CIEMAT:"Sensitiveness of Evolutionary Algorithms to the Rando Number Generator", http://www.icannga.com/icannga11.php
|-
|-
|14-16 April||Ljubljiana, Slovenia||ICANNGA, LNCS (Springer) ||1||Paper accepted: "Sensitiveness of Evolutionary Algorithms to the Rando Number Generator", http://www.icannga.com/icannga11.php
|11-14 April||Vilnius, Lithuania||EGI User Forum 2011|| ~ 15||  
* Participation from several IBERGRID institutes with contributions in different sessions. Good meeting point to hear about how other NGIs are progressing and facing the challeges of operating DCIs. Good to acknowledge user ideas, perpectives and difficulties;  http://uf2011.egi.eu/
* CESGA: Contribution with the session “Federated cloud computing enviroment for malaria fighting”; https://www.egi.eu/indico/contributionDisplay.py?contribId=30&confId=207
* PIC: Contribution with the session “Site integral management with Puppet” describing PIC experience managing hundreds of nodes in an automated way with the tool Puppet; https://www.egi.eu/indico/contributionDisplay.py?contribId=133&sessionId=20&confId=207
* PIC: Contribution with the session “Improving CMS data transfers among its distributed Computing Facilities“ describing the performance analysis and optimisation of the FTS transfers carried out in the context of the CMS experiment;
* LIP: Contribution with the session "NGI_IBERGRID experiences with regional tool" describing the ROD model for operation in the NGI; https://www.egi.eu/indico/contributionDisplay.py?contribId=210&confId=207
* IFCA: contribution with the session "A uniform MPI user experience with MPI-Start in EMI"; https://www.egi.eu/indico/contributionDisplay.py?contribId=28&sessionId=13&confId=207
|-
|-
|11-14 April|| Vilnius, Lithuania|| EGI User Forum 2011||1|| Contribution for the session “Virtualisation and Cloud Computing” with the presentation “Federated cloud computing enviroment for malaria fighting”, https://www.egi.eu/indico/contributionDisplay.py?contribId=30&confId=207
| 11 April || Madrid, Spain || Meeting of the Networking Group for the LHC in Spain || 1 ||  
* PIC: Annual meeting of the WLCG sites in Spain with the NREN (RedIRIS) to present and discuss about the status of the network infrastructures at the Sites and at the NREN level and its impact on the WLCG present and future activities.
|-
|-
|2 March || Amsterdam, Netherlands || Task Leaders and AMB F2F meeting||1|| Contribution for session "Manual Metrics Collection, https://www.egi.eu/indico/conferenceDisplay.py?confId=351
|6-7 April || Karlsruhe, Germany || EGI-CSIRT Face to face meeting || 1 ||
* REDIRIS: https://www.egi.eu/indico/conferenceDisplay.py?confId=438
|-
|-
|11-14 April|| Vilnius, Lithuania|| EGI User Forum 2011||2|| M. Caubet presented the work “Site integral management with Puppet” describing PIC experience managing hundreds of nodes in an automated way with the tool Puppet, https://www.egi.eu/indico/contributionDisplay.py?contribId=133&sessionId=20&confId=207
| 4-8 April|| CERN, Geneva, Swiss|| CMS Computing & Offline week||1||  
|-
* PIC: Follow up of the CMS WLCG activities.
|11-14 April|| Vilnius, Lithuania|| EGI User Forum 2011||2|| J. Flix presented the work “Improving CMS data transfers among its distributed Computing Facilities“ describing the performance analysis and optimisation of the FTS transfers carried out in the context of the CMS experiment,  
https://indico.cern.ch/conferenceOtherViews.py?view=standard&confId=132001
|-  
| 16-17 March || Göttingen||5th dCache Workshop||1||
* PIC: Annual meeting of the dCache developers and main user sites to discuss future plans and release planning, http://indico.desy.de/conferenceDisplay.py?confId=3959
|-
|-
|10-11 February|| Lyon, France|| LHC OPN meeting||1|| Follow up of the LHC Optical Private Network group activities. The WLCG Tier1 centres are represented and G. Bernabeu was attending representing PIC. One of the key topics was the discussion on the networking requirements and infrastructure for Tier2s, https://indico.cern.ch/conferenceDisplay.py?confId=110149
| 7-8 March || Lyon, France || LHCb Tier1 Jamboree||2||  
* PIC: Annual face to face meeting of the LHCb experiment with the Tier1 centres to follow up the computing services status and discuss about future activities and planning. PIC presented results on the deployment of CernVM-FS for the LHCb software distribution, http://indico.in2p3.fr/conferenceTimeTable.py?confId=4854
|-
|-
| 7-8 March || Lyon, France || LHCb Tier1 Jamboree||2|| Annual face to face meeting of the LHCb experiment with the Tier1 centres to follow up the computing services status and discuss about future activities and planning. V. Méndez and G. Merino were attending representing PIC Tier1 and presented results on the deployment of CernVM-FS for the LHCb software distribution, http://indico.in2p3.fr/conferenceTimeTable.py?confId=4854
|2 March || Amsterdam, Netherlands || Task Leaders and AMB F2F meeting||1||  
|-
* CESGA: "Manual Metrics Collection, https://www.egi.eu/indico/conferenceDisplay.py?confId=351
| 16-17 March || Göttingen||5th dCache Workshop||1||Annual meeting of the dCache developers and main user sites to discuss future plans and release planning, http://indico.desy.de/conferenceDisplay.py?confId=3959
|-
|-
| 4-8 April|| CERN, Geneva, Swiss|| CMS Computing & Offline week||1|| Follow up of the CMS WLCG activities. J. Flix was attending from PIC as CMS contact person at the Tier1,
|10-11 February|| Lyon, France|| LHC OPN meeting||1||  
https://indico.cern.ch/conferenceOtherViews.py?view=standard&confId=132001
* PIC: Follow up of the LHC Optical Private Network group activities. The WLCG Tier1 centres were represented. One of the key topics was the discussion on the networking requirements and infrastructure for Tier2s, https://indico.cern.ch/conferenceDisplay.py?confId=110149
|-
|-
| 11 April || Madrid, Spain || Meeting of the Networking Group for the LHC in Spain || 1 || Annual meeting of the WLCG sites in Spain with the NREN (RedIRIS) to present and discuss about the status of the network infrastructures at the Sites and at the NREN level and its impact on the WLCG present and future activities.
| 24 January || Utrecht, Netherlands|| EugridPMA meeting  ||1||
* LIP: http://www.eugridpma.org/meetings/2011-01/
|}
|}



Latest revision as of 17:46, 22 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



Quarterly Report Number NGI Name Partner Name Author
QR4 Ibergrid LIP & CSIC G. Borges (LIP)


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
14th April Vilnius, Luthuania MPI hands on training ~10

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
14-16 April Ljubljiana, Slovenia ICANNGA, LNCS (Springer) 1
11-14 April Vilnius, Lithuania EGI User Forum 2011 ~ 15
11 April Madrid, Spain Meeting of the Networking Group for the LHC in Spain 1
  • PIC: Annual meeting of the WLCG sites in Spain with the NREN (RedIRIS) to present and discuss about the status of the network infrastructures at the Sites and at the NREN level and its impact on the WLCG present and future activities.
6-7 April Karlsruhe, Germany EGI-CSIRT Face to face meeting 1
4-8 April CERN, Geneva, Swiss CMS Computing & Offline week 1
  • PIC: Follow up of the CMS WLCG activities.

https://indico.cern.ch/conferenceOtherViews.py?view=standard&confId=132001

16-17 March Göttingen 5th dCache Workshop 1
7-8 March Lyon, France LHCb Tier1 Jamboree 2
  • PIC: Annual face to face meeting of the LHCb experiment with the Tier1 centres to follow up the computing services status and discuss about future activities and planning. PIC presented results on the deployment of CernVM-FS for the LHCb software distribution, http://indico.in2p3.fr/conferenceTimeTable.py?confId=4854
2 March Amsterdam, Netherlands Task Leaders and AMB F2F meeting 1
10-11 February Lyon, France LHC OPN meeting 1
24 January Utrecht, Netherlands EugridPMA meeting 1

1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

  1. The IBERGRID r-Nagios service has been configured to use Ibergrid core services in a failover. The only service for which there is not a failover mechanism is for MyProxy service.
  2. Start enforcing the support on regional macro VOs. The policy is that sites in the region should provide at least the 20% of their resources to the regional macro VOs indicated as a payment of the international services provided by the NGI. If it is not possible (if the local infrastructure is owned by dedicated projects) sites should select at least one of these macro VOs and provide opportunistic access. Simultaneously the decomission of old regional VOs started.
  3. Regional VOMS replication scheme implementation in progress. The aim is to keeping DB copies of a main host (MASTER) in a secondary host (SLAVE). By architecture, the slave host will only have read access to the Database entries.
  4. Successfull upgrades on the regional operation dashboard and on the regional nagios.
  5. Enforcement of the phase out of EGEE name in the information system.
  6. Internal discussion of the Resource Centre OLA (ongoing).
  7. Produce internal documentation on accounting, benchmarking and on gLite-Cluster node.
  8. Following a request from WLCG, we have developed a schema to support TopBDIIs in high availability mode.
  9. Contribution on a best effort basis to the Certification Manual documentation.
  10. Several IBERGRID sites contributed to the Stage Rollout process.
  11. Completion of the Survey for supported OS platforms, LB, service management and monitoring (for EMI components).
  12. Provide input to the list of components from EMI 1.0 that should be integrated in UMD with high priority.
  13. Both Portugal and Spain have provided self-assessment input of NGI international tasks for MS109.
  14. Provide feedback to deliverable D4.2 - Annual Report on the EGI Production Infrastructure
  15. Review of the deliverables D5.2 - Annual Report on the status of the software provisioning activity and the work of DMSU; and D6.3 - Annual Report on the Tools and Services of the Heavy User Communities
  16. Ibergrid ROD team was invited to share their support model and experience with regional tools during the ROD session in EGI User Forum (https://www.egi.eu/indico/contributionDisplay.py?sessionId=9&contribId=210&confId=207)

2.2. Main Achievements

  1. Invitation to report the IBERGRID operational model in the ROD session in EGI User Forum (https://www.egi.eu/indico/contributionDisplay.py?sessionId=9&contribId=210&confId=207)
  2. Assessement of the high availability schema for the regional TopBDIIs
  3. Successfull upgrades on the regional operation dashboard and on the regional nagios.
  4. Stage Rollout participation

2.3. Issues and mitigation

Issue Description Mitigation Description
MyProxy represents a single point of failure for the regional nagios service We were investigating the possibility of using Robot certificates for the IBERGRID r-Nagios
Identified timeout problem with VOMS Open GGUS ticket #69356 - VOMS support recognized the issue has a bug
Sync problems between regional and central dashboard GGUS #68414 Ticket opened and assigned to COD
Notification problem bewtween r-NAGIOS and Operational Portal GGUS #68414 Ticket opened and assigned to COD
Spanish sites had a GÉANT network issue (since 13:30 PM to 18:00 PM on the 03/17/2011) with consequences in availability/reliability metrics GGUS ticket #68848 was open in order to do not take into account that period in the A/R metrics.