Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Ibergrid-QR4"

From EGIWiki
Jump to navigation Jump to search
Line 79: Line 79:
# The IBERGRID r-Nagios service has been configured to use Ibergrid core services in a failover. The only service for which there is not a failover mechanism is for MyProxy service.  
# The IBERGRID r-Nagios service has been configured to use Ibergrid core services in a failover. The only service for which there is not a failover mechanism is for MyProxy service.  
# Completion of the Survey for supported OS platforms, LB, service management and monitoring (for EMI components).
# Completion of the Survey for supported OS platforms, LB, service management and monitoring (for EMI components).
# Start enforcing the support on regional macro VOs. The policy is that sites in the region should provide at least the 20% of their resources to the regional macro VOs indicated as a payment of the international services provided by the NGI. If it is not possible (if the local infrastructure is owned by dedicated projects) sites should select at least one of these macro VOs and provide opportunistic access.
# Start enforcing the support on regional macro VOs. The policy is that sites in the region should provide at least the 20% of their resources to the regional macro VOs indicated as a payment of the international services provided by the NGI. If it is not possible (if the local infrastructure is owned by dedicated projects) sites should select at least one of these macro VOs and provide opportunistic access. Simultaneously the decomission of old regional VOs started.
 
# Both Portugal and Spain have provided self-assessment input of NGI international tasks for MS109
, and simultaneously, start decomission old regional VOs.
# Provide input to the list of components from EMI 1.0 that should be integrated in UMD with high priority
#  
# Contribution on a best effort basis to the Certification Manual documentation
# Internal discussion of the Resource Centre OLA (ongoing).
# Produce internal documentation on accounting, benchmarking and on gLite-Cluster node.
# Regional VOMS replication scheme implementation in progress. The aim is to keeping DB copies of a main host (MASTER) in a secondary host (SLAVE). By architecture, the slave host will only have read access to the Database entries.
#


===2.2. Main Achievements===
===2.2. Main Achievements===

Revision as of 18:54, 28 April 2011


Quarterly Report Number NGI Name Partner Name Author
QR4 Ibergrid LIP & CSIC G. Borges (LIP)


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

  1. The IBERGRID r-Nagios service has been configured to use Ibergrid core services in a failover. The only service for which there is not a failover mechanism is for MyProxy service.
  2. Completion of the Survey for supported OS platforms, LB, service management and monitoring (for EMI components).
  3. Start enforcing the support on regional macro VOs. The policy is that sites in the region should provide at least the 20% of their resources to the regional macro VOs indicated as a payment of the international services provided by the NGI. If it is not possible (if the local infrastructure is owned by dedicated projects) sites should select at least one of these macro VOs and provide opportunistic access. Simultaneously the decomission of old regional VOs started.
  4. Both Portugal and Spain have provided self-assessment input of NGI international tasks for MS109
  5. Provide input to the list of components from EMI 1.0 that should be integrated in UMD with high priority
  6. Contribution on a best effort basis to the Certification Manual documentation
  7. Internal discussion of the Resource Centre OLA (ongoing).
  8. Produce internal documentation on accounting, benchmarking and on gLite-Cluster node.
  9. Regional VOMS replication scheme implementation in progress. The aim is to keeping DB copies of a main host (MASTER) in a secondary host (SLAVE). By architecture, the slave host will only have read access to the Database entries.

2.2. Main Achievements

2.3. Issues and mitigation

  1. We were investigating the possibility of using Robot certificates for the IBERGRID r-Nagios to mitigate the fact that MyProxy represents a single point of failure for the regional moniroting service.
Issue Description Mitigation Description