Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Ibergrid-QR10"

From EGIWiki
Jump to navigation Jump to search
Line 91: Line 91:
!scope="col"| Mitigation Description
!scope="col"| Mitigation Description
|-
|-
Some sites in the IBERIAN region are requesting the use of relocatable tarballs for UIs and WNs. This is a know issue which is already being followed by EGI Operations through RT #4351, and GGUS #74675, #=81496
Some sites in the IBERIAN region are requesting the use of relocatable tarballs for UIs and WNs. This is a know issue which is already being followed by EGI Operations through RT #4351, and GGUS #74675, #=81496 || The problem is still not solved
The problem is still not solved
|}
|}



Revision as of 13:38, 4 November 2012


Quarterly Report Number NGI Name Partner Name Author
QR10 NGI_IBERGRID LIP & CSIC Goncalo Borges


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

  1. Follow up with sites which were publishing accounting data with unknown UserDNs.
  2. Follow up with sites that had to republish accounting data, and coordinate with the Accounting Repository staff for the republishing of large amounts of data.
  3. Provide information about the sustainability status after May 2014 and about the EGI Global operations services.
  4. Collect and report experience about national VOs running on EMI WN
  5. Collect and provide information about the IBERGRID and site-specific resource allocation policies

2.2. Main Achievements

  1. A systematic 100% A/R (6 months in a row) for the TopBDII service (after the implementation of the TopBDII HA mechanism).

2.3. Issues and mitigation

Some sites in the IBERIAN region are requesting the use of relocatable tarballs for UIs and WNs. This is a know issue which is already being followed by EGI Operations through RT #4351, and GGUS #74675, #=81496 || The problem is still not solved
Issue Description Mitigation Description