Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Globus integration task force"

From EGIWiki
Jump to navigation Jump to search
Line 24: Line 24:


== Open Actionpoints ==
== Open Actionpoints ==
* AP on everybody: Advertise First Globus community Forum Meeting http://www.ige-project.eu/events/egcf1


* AP: MB to test GGUS leaf to IGE: what is the mailinglist and who is on it.
* AP: MB to test GGUS leaf to IGE: what is the mailinglist and who is on it.
* AP: HH (or somebody else from IGE) to provide more details and timelines on IIS in the https://rt.egi.eu/rt/Ticket/Display.html?id=390 RT ticket and our mailinglist after the EGCF1


* AP: MB to ask NGIs on desired timelines for Globus integration to determine need for a second Early Adopter team for Globus at current stage.
* AP: MB to ask NGIs on desired timelines for Globus integration to determine need for a second Early Adopter team for Globus at current stage.
** AP: TA to ask within NGI-DE for a second EA volunteer.
** AP: TA to ask within NGI-DE for a second EA volunteer.


* AP on everybody: Advertise First Globus community Forum Meeting http://www.ige-project.eu/events/egcf1


* AP: MB to send link with suggested extensions to OGF-UR by APEL to HH. HH to check within IGE if those extensions are sufficient for use in Grid-SAFE.
* AP: MB to send link with suggested extensions to OGF-UR by APEL to HH. HH to check within IGE if those extensions are sufficient for use in Grid-SAFE.


* AP: MB to organize the next meeting as a dedicated accounting meeting with the accounting experts: either as a Phoneconference slot during the EGCF1 or in week 21 before the 2nd EMI allhands F2F in Lund.
* AP: MB to organize the next meeting as a dedicated accounting meeting with the accounting experts: either as a Phoneconference slot during the EGCF1 or in week 21 before the 2nd EMI allhands F2F in Lund.


== Closed Actionpoints ==
== Closed Actionpoints ==

Revision as of 11:16, 4 May 2011

Main EGI-inSPIRE SA1 Tools Middleware Documentation Security Performance Interoperability



The meetings will be found in indico under the catagory https://www.egi.eu/indico/categoryDisplay.py?categId=53. A new dedicated mailinglist has been created: it is called globus-integration-tf@mailman.egi.eu https://www.egi.eu/sso/groupView/globus-integration-tf Current members are those who expressed interest to participate in the first meeting or were attending it or were pointed out by other people.

Open Actionpoints


  • AP: MB to test GGUS leaf to IGE: what is the mailinglist and who is on it.



  • AP: MB to ask NGIs on desired timelines for Globus integration to determine need for a second Early Adopter team for Globus at current stage.
    • AP: TA to ask within NGI-DE for a second EA volunteer.


  • AP: MB to send link with suggested extensions to OGF-UR by APEL to HH. HH to check within IGE if those extensions are sufficient for use in Grid-SAFE.


  • AP: MB to organize the next meeting as a dedicated accounting meeting with the accounting experts: either as a Phoneconference slot during the EGCF1 or in week 21 before the 2nd EMI allhands F2F in Lund.

Closed Actionpoints

  • AP: Fill mailinglist
  • AP: Decide on date for first meeting and put together an agenda.

https://www.egi.eu/indico/conferenceDisplay.py?confId=469