Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Germany-QR14"

From EGIWiki
Jump to navigation Jump to search
Line 129: Line 129:
* DESY-HH maintains a smooth running of the infrastructure with almost 8.000 job slots and 7.7PB of disk space (slight increase in the disk space during last three months +400TB). In addition, all worker nodes are migrated to SL6/emi3 during the reported period and the storage was migrated to the sha-2 compliant version.
* DESY-HH maintains a smooth running of the infrastructure with almost 8.000 job slots and 7.7PB of disk space (slight increase in the disk space during last three months +400TB). In addition, all worker nodes are migrated to SL6/emi3 during the reported period and the storage was migrated to the sha-2 compliant version.
* LRZ registered and certified a new site "LRZ"
* LRZ registered and certified a new site "LRZ"
* The site ITWM takes part in the EMI staged rolled-out and pperformed ppdate for GOCDB failover instance.


=== 2.3. Issues and mitigation  ===
=== 2.3. Issues and mitigation  ===

Revision as of 10:41, 5 November 2013

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports




Quarterly Report Number NGI Name Partner Name Author
QR 14 NGI_DE Germany Jie Tao


1. MEETINGS AND DISSEMINATION

Note: Complete the tables below by adding as many rows as needed.

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
August 26-30, 2013 Karlsruhe, Germany GridKa School 2013 "Big Data, Clouds and Grids" World-wide Grid experts and students http://gridka-school.scc.kit.edu/2013/index.php
August 26-30, 2013 Karlsruhe, Germany EGI CSIRT - Security training at GridKa School 2013 security staff https://wiki.egi.eu/wiki/EGI_CSIRT:Main_Page

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
September 16-20, 2013 Madrid EGI Technical Forum DESY-HH, LRZ, KIT https://indico.egi.eu/indico/conferenceDisplay.py?confId=1417
September 19, 2013 Madrid GlobusEurope LRZ http://www.egcf.eu/events/globuseurope-2013/
Sep. 30-01.Oct., 2013 Lugano ATLAS gridka Cloud F2F meeting Wuppertal http://www.lhep.unibe.ch/gsciacca/GridKa-f2f-2013.html
October 14-18, 2013 Amsterdam CHEP 2013 DESY-HH Poster: Job Scheduling in Grid Farms


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?
<Publication title> <Journal/Proceedings> Vol:<volume number>
Issue:<Issue>
Pg: <from> - <to>
1.<Author 1>
2.<Author2>
3. <Author3>
<Publication title> <Journal/Proceedings> Vol:<volume number>
Issue:<Issue>
Pg: <from> - <to>
1.<Author 1>
2.<Author2>
3. <Author3>
<Publication title> <Journal/Proceedings> Vol:<volume number>
Issue:<Issue>
Pg: <from> - <to>
1.<Author 1>
2.<Author2>
3. <Author3>

2. ACTIVITY REPORT

2.1. Progress Summary

Grid services run smoothly on all sites. ROD shift works well. Update packets are installed and rolled-out is performed. The GridKa School 2013 was successfully

2.2. Main Achievements

The following are concrete achievements of the NGI-DE sites:

  • TU Dresden ZIH conducted the installation of CVFMS for Atlas software management and the VOMS server updates for Atlas and SNOplus.
  • Wuppertal performed a migration to RHEL 6 on the full cluster, the decommissioning of the CREAM CE, installation of an ARC CE, CVMFS update, as well as dCache update to 2.6.9.
  • DESY-HH maintains a smooth running of the infrastructure with almost 8.000 job slots and 7.7PB of disk space (slight increase in the disk space during last three months +400TB). In addition, all worker nodes are migrated to SL6/emi3 during the reported period and the storage was migrated to the sha-2 compliant version.
  • LRZ registered and certified a new site "LRZ"
  • The site ITWM takes part in the EMI staged rolled-out and pperformed ppdate for GOCDB failover instance.

2.3. Issues and mitigation

Issue Description Mitigation Description
DESY-HH: unclear state with the support of tarball emi distribution for the ui. The site investigated different possibilities (installation over rpm or over cvmfs).