1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
11.-14.4 Vilnius EGI User Forum( organized following two meetings) 5 see all EGI User Forum reports and material
11.4. Vilnius Operational Documentation F2F 1 (total of 12 participants) https://www.egi.eu/indico/contributionDisplay.py?sessionId=9&contribId=29&confId=207
11.4 Vilnius ROD teams training session 2 (total of 30 participants) https://www.egi.eu/indico/contributionDisplay.py?sessionId=9&contribId=91&confId=207


1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
11.-14.4 Vilnius EGI User Forum 5 see all EGI User Forum reports and material
11.4 Vilnius ROD teams training session 2 https://www.egi.eu/indico/contributionDisplay.py?sessionId=9&contribId=91&confId=207
11.4. Vilnius Grid Oversight, ensuring the quality of the Grid infrastructure 2

https://www.egi.eu/indico/contributionDisplay.py?contribId=92&sessionId=9&confId=207

14.4 Vilnius OMB face to face meeting 1 https://www.egi.eu/indico/conferenceDisplay.py?confId=267


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

OC creation progress was delayed by technical complications (renaming the NDGF NGI "CSC" site first, so that we could create our new CSC site under the NGI_FI). However, the establishment of the NGI_FI OC should be finalized during May.

Resources from CSC site will be provisioned using ARC 1.0 which has also coused some delay on service and resource integration to EGI, for example bugs in ARC 1.0 job submission to SLURM batch system did not work.

Personal certificate acquisition process in Finland will change in May. Lot of enabling work has been performed during Q4 to enable move from Nordugrid CA to Terena Certificate service.

2.2. Main Achievements

2.3. Issues and mitigation

Issue Description Mitigation Description
  • ARC1 not working with SLURM 2.2.x (x>1) | Patch submitted and accepted to devs
  • ARC1 DoS via locking bug in downloader | Problem reported to devs, no patch yet
  • ARC1 problems with interoperability with older ARC0.8 releases | Suggestions made to update documentation