Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Finland-QR3"

From EGIWiki
Jump to navigation Jump to search
 
(12 intermediate revisions by 3 users not shown)
Line 1: Line 1:
__NOTOC__
{{Template:EGI-Inspire menubar}}
 
{{Template:Inspire_reports_menubar}}
{{TOC_right}}
 


{| border="1" cellspacing="0" cellpadding="2"
{| border="1" cellspacing="0" cellpadding="2"
Line 20: Line 24:


==1. MEETINGS AND DISSEMINATION ==
==1. MEETINGS AND DISSEMINATION ==
<!--
=====GENERAL GUIDELINES FOR ALL EVENTS REPORTED IN THE FOLLOWING SECTIONS:=====
=====GENERAL GUIDELINES FOR ALL EVENTS REPORTED IN THE FOLLOWING SECTIONS:=====
*please do not provide a list of participants, only give the number of people that attended
*please do not provide a list of participants, only give the number of people that attended
Line 27: Line 32:
**If your presentation is not available online, please send the slides to erika.swiderski@egi.eu.  
**If your presentation is not available online, please send the slides to erika.swiderski@egi.eu.  
Note: Complete the tables below by adding as many rows as needed.  
Note: Complete the tables below by adding as many rows as needed.  
Note: Complete the tables below by adding as many rows as needed.  
Note: Complete the tables below by adding as many rows as needed. -->


===1.1. CONFERENCES/WORKSHOPS ORGANISED===
===1.1. CONFERENCES/WORKSHOPS ORGANISED===
Line 40: Line 45:
|-
|-
|19.01.2011||Espoo, Finland||FGI kick-off||24||Kick off meeting for the procurement process for Finnish 2M€ grid resource investment. Purchased hardware will be installed in 9 sites and connected to EGI||
|19.01.2011||Espoo, Finland||FGI kick-off||24||Kick off meeting for the procurement process for Finnish 2M€ grid resource investment. Purchased hardware will be installed in 9 sites and connected to EGI||
|-
|<Date>||<Location>||<Title>||<Participants>||Test
<!-- formatting_test -->
<!-- formatting_test -->
|-
|-
Line 78: Line 81:
|-
|-
!scope="col"|Publication title||Journal / Proceedings title||align="left" |Journal references<br> ''Volume number<br> Issue<br><br>Pages from - to''||align="left" |Authors ''<br>1.<br>2.<br>3.<br>Et al?''
!scope="col"|Publication title||Journal / Proceedings title||align="left" |Journal references<br> ''Volume number<br> Issue<br><br>Pages from - to''||align="left" |Authors ''<br>1.<br>2.<br>3.<br>Et al?''
|-
 
|<Publication title>||<Journal/Proceedings>||Vol:<volume number><br>Issue:<Issue><br>Pg: <from> - <to>||1.<Author 1><br>2.<Author2><br>3. <Author3><br>
|-
|<Publication title>||<Journal/Proceedings>||Vol:<volume number><br>Issue:<Issue><br>Pg: <from> - <to>||1.<Author 1><br>2.<Author2><br>3. <Author3><br>
|-
|<Publication title>||<Journal/Proceedings>||Vol:<volume number><br>Issue:<Issue><br>Pg: <from> - <to>||1.<Author 1><br>2.<Author2><br>3. <Author3><br>
|}
|}


Line 91: Line 89:
===2.1. Progress Summary===
===2.1. Progress Summary===
<!-- Provide your test below -->
<!-- Provide your test below -->
Finnish national grid infrastructure has worked nicely. 3.1.2011 Academy of Finland granted 2 M€ for the new hardware investments for national grid infrastructure (NGI_FI or FGI). Purchased hardware will be located in 9 sites will be connected to EGI later 2011. The only gLite resource in Finland (64 cores for ESRVO) was decommissioned in the end of November 2011 when NGI_FI decided to provide all EGI resources through ARC middleware in order to reduce maintenance work required for two middleware stacks.
Finnish national grid infrastructure has worked nicely. 3.1.2011 Academy of Finland granted 2 M€ for the new hardware investments for national grid infrastructure (NGI_FI or FGI). Purchased hardware will be located in 9 sites will be connected to EGI late 2011 / early 2012.  
 
The only gLite resource in Finland (64 cores for ESRVO) was decommissioned in the end of November 2011 when NGI_FI decided to provide all EGI resources through ARC middleware in order to reduce maintenance work required for two middleware stacks.
 
Setting up the NGI_FI continued slower than anticipated, but there were some progress however.


===2.2. Main Achievements===
===2.2. Main Achievements===
Line 98: Line 100:
-->
-->
Major update of SGAS accounting system.
Major update of SGAS accounting system.
Setup of Nagios monitoring.
Setup of Nagios monitoring.


Line 106: Line 109:
!scope="col"| Issue Description
!scope="col"| Issue Description
!scope="col"| Mitigation Description
!scope="col"| Mitigation Description
|-
|Issue description || Issue mitigation
|-
|-
|}
|}
Interoperability between the ARC middleware and the operational and monitoring tools remains the main issue.  
Interoperability between the ARC middleware and the operational and monitoring tools remains the main issue.  
|-
 
When gLite resources were decommissioned in the end of November everything did not go as nicely as planned because in monitoring systems csc_ce showed really bad availability statistics (0%). i.e. the monitoring of resource didn't stop after the resource was closed.
When gLite resources were decommissioned in the end of November everything did not go as nicely as planned because in the monitoring of the systems continued for whole December. This caused 0% availability figures for the resource.
 
<!--
<!--
  Please, fill the table below. You can add a line copyng the two lines
  Please, fill the table below. You can add a line copyng the two lines

Latest revision as of 16:37, 6 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports




Quarterly Report Number NGI Name Partner Name Author
3 NGI_FI Finland Pekka Lehtovuori


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
2.-3.12.2010 Copenhagen NDGF All Hands 11
19.01.2011 Espoo, Finland FGI kick-off 24 Kick off meeting for the procurement process for Finnish 2M€ grid resource investment. Purchased hardware will be installed in 9 sites and connected to EGI

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
19.1.2011 Amsterdam SA1 Roadmap discussion 1 Outcome
21.1.2011 Amsterdam Information systems and ARC integration 1 Meeting with Tiziana on title topic
24.-25.1.2011 Amsterdam OMB F2F 2 https://www.egi.eu/indico/conferenceDisplay.py?confId=153
25.1.2011 Amsterdam OTAG 2 https://www.egi.eu/indico/conferenceDisplay.py?confId=245
26.1.2011 Amsterdam F2F with COD 1


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

Finnish national grid infrastructure has worked nicely. 3.1.2011 Academy of Finland granted 2 M€ for the new hardware investments for national grid infrastructure (NGI_FI or FGI). Purchased hardware will be located in 9 sites will be connected to EGI late 2011 / early 2012.

The only gLite resource in Finland (64 cores for ESRVO) was decommissioned in the end of November 2011 when NGI_FI decided to provide all EGI resources through ARC middleware in order to reduce maintenance work required for two middleware stacks.

Setting up the NGI_FI continued slower than anticipated, but there were some progress however.

2.2. Main Achievements

Major update of SGAS accounting system.

Setup of Nagios monitoring.

2.3. Issues and mitigation

Issue Description Mitigation Description

Interoperability between the ARC middleware and the operational and monitoring tools remains the main issue.

When gLite resources were decommissioned in the end of November everything did not go as nicely as planned because in the monitoring of the systems continued for whole December. This caused 0% availability figures for the resource.