Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Finland-QR12"

From EGIWiki
Jump to navigation Jump to search
 
(4 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Template:Op menubar}} {{Template:Inspire_reports_menubar}} {{TOC_right}}  
{{Template:EGI-Inspire menubar}}
{{Template:Inspire_reports_menubar}} {{TOC_right}}  


<br>  
<br>  
Line 10: Line 11:
! scope="col" | Author
! scope="col" | Author
|-
|-
| &lt;Number of Quarterly report&gt;
| QR12
| &lt;NGI Name&gt;
| NGI_FI
| &lt;NGI Country&gt;
| Finland
| &lt;Name of person submitting the QR&gt;
| Jura Tarus
|}
|}


Line 51: Line 52:
! Outcome (Short report &amp; Indico URL)
! Outcome (Short report &amp; Indico URL)
|-
|-
| &lt;Date&gt;
| 8.-14.4.2013
| &lt;Location&gt;
| Manchester
| &lt;Title&gt;
| EGI UF
| &lt;Participants&gt;
| 5
| &lt;Outcome&gt;
|  
|}
|}


Line 70: Line 71:
===2.1. Progress Summary=== <!-- Provide your test below -->  
===2.1. Progress Summary=== <!-- Provide your test below -->  


===2.2. Main Achievements=== <!--
===2.2. Main Achievements===  
In addition to normal customer support, grid related training was provided in the  
In addition to normal customer support, grid related training was provided in the  
CSC Winter School in Bioinformatics 2013 (March 5th – 8th).
CSC Winter School in Bioinformatics 2013 (March 5th – 8th).
Line 84: Line 85:
As for meetings and conferences, we have attended the EGI CF and contributed to the sessions there.
As for meetings and conferences, we have attended the EGI CF and contributed to the sessions there.


-->
 


=== 2.3. Issues and mitigation  ===
=== 2.3. Issues and mitigation  ===
Line 101: Line 102:
|-
|-
| Issue Description || Issue mitigation
| Issue Description || Issue mitigation
-->  
-->
 
[[Category:NGI_QR_Reports]]

Latest revision as of 15:56, 6 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports




Quarterly Report Number NGI Name Partner Name Author
QR12 NGI_FI Finland Jura Tarus


1. MEETINGS AND DISSEMINATION

Note: Complete the tables below by adding as many rows as needed.

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
5.-8.3.2013 CSC CSC Winter School in Bioinformatics 2013 23 Grid training included

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
8.-14.4.2013 Manchester EGI UF 5



2. ACTIVITY REPORT

2.1. Progress Summary

2.2. Main Achievements

In addition to normal customer support, grid related training was provided in the CSC Winter School in Bioinformatics 2013 (March 5th – 8th).

Runtime environment for FSL NMR brain imaging software was added to the FGI and several other runtime environments were upgraded. In addition to that, a first prototype of automatic grid job submission tool InterProScan protein sequence analysis tool was constructed.

Finland has been contributing to the development of SAM Nagois by being Early Adopters, as well as doing development and testing for new ARC SAM Nagios probes. We have also contributed to a pan-NGI drive to get ARC to submit accounting records directly to APEL. As for meetings and conferences, we have attended the EGI CF and contributed to the sessions there.


2.3. Issues and mitigation

Issue Description Mitigation Description
Issue description Issue mitigation