Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Denmark-QR4"

From EGIWiki
Jump to navigation Jump to search
Line 108: Line 108:
| Poor performance of UNICPH-NBI due to a power cut and a bug in the ARC middleware which caused the information system to not start automatically and resulted in low availability. The site was not monitored and the issue was not discovered until the GGUS ticket arrived. || The fix was to add the site to NDGF monitoring as explained in [https://gus.fzk.de/ws/ticket_info.php?ticket=68374 GGUS #68374].
| Poor performance of UNICPH-NBI due to a power cut and a bug in the ARC middleware which caused the information system to not start automatically and resulted in low availability. The site was not monitored and the issue was not discovered until the GGUS ticket arrived. || The fix was to add the site to NDGF monitoring as explained in [https://gus.fzk.de/ws/ticket_info.php?ticket=68374 GGUS #68374].
|-
|-
| How to add ELIXIR resources? || None
| No knowledge on how to add ELIXIR resources to EGI || None
|-
|-
|}
|}

Revision as of 17:01, 11 May 2011


Quarterly Report Number NGI Name Partner Name Author
QR4 NGI_NDGF UCPH Anders Wäänänen


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
6-7.4 Karlsruhe, KIT EGI CSIRT Face to Face Meeting 1 https://www.egi.eu/indico/conferenceDisplay.py?confId=438
11.-14.4 Vilnius EGI User Forum 2 see all EGI User Forum reports and material


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

Operation of local grid services ran satisfactorily, as well as the CA run by UCPH on behalf of the Nordic countries. Trained new personnel for participation in NDGF's shared OoD scheme.

Analysed, reverse engineered, and traced hacking attempt on egi infrastructure. Presented results at EGI-CSIRT

Adding another ARC site in Ålborg (DCSC/AAU) with approx 700 cores is in progress, but not finalized at the end of Q4. Expected to be up in Q5.

Initial investigation on adding resources from ELIXIR project.

2.2. Main Achievements

2.3. Issues and mitigation

Issue Description Mitigation Description
Poor performance of UNICPH-NBI due to a power cut and a bug in the ARC middleware which caused the information system to not start automatically and resulted in low availability. The site was not monitored and the issue was not discovered until the GGUS ticket arrived. The fix was to add the site to NDGF monitoring as explained in GGUS #68374.
No knowledge on how to add ELIXIR resources to EGI None