Difference between revisions of "EGI-InSPIRE:Denmark-QR4"
Jump to navigation
Jump to search
Line 83: | Line 83: | ||
Operation of local grid services ran satisfactorily, as well as the CA run by UCPH on behalf of the Nordic countries. | Operation of local grid services ran satisfactorily, as well as the CA run by UCPH on behalf of the Nordic countries. | ||
Trained new personnel for participation in NDGF's shared OoD scheme. | Trained new personnel for participation in NDGF's shared OoD scheme. | ||
Analysed and traced hacking attempt on egi infrastructure. Presented results at EGI-CSIRT | |||
===2.2. Main Achievements=== | ===2.2. Main Achievements=== |
Revision as of 17:14, 11 May 2011
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
QR4 | NGI_NDGF | UCPH | Anders Wäänänen |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
6-7.4 | Karlsruhe, KIT | EGI CSIRT Face to Face Meeting | 1 | https://www.egi.eu/indico/conferenceDisplay.py?confId=438 |
11.-14.4 | Vilnius | EGI User Forum | 2 | see all EGI User Forum reports and material |
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
Operation of local grid services ran satisfactorily, as well as the CA run by UCPH on behalf of the Nordic countries. Trained new personnel for participation in NDGF's shared OoD scheme.
Analysed and traced hacking attempt on egi infrastructure. Presented results at EGI-CSIRT
2.2. Main Achievements
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|