Difference between revisions of "EGI-InSPIRE:Czech Rep-US-QR10"

From EGIWiki
Jump to: navigation, search
(2.2. Plans)
(2.1. User Support achievements)
Line 66: Line 66:
  
 
===2.1. User Support achievements===
 
===2.1. User Support achievements===
 +
VO auger:
 +
Continuous bulk production.
 +
First discussions about possible use of the DIRAC as a file catalogue
 +
and possible also production system. Tests of file transfers to a new
 +
SE associated with the Prague site but located in Pilsen (aka
 +
distributed Tier2). Demonstration of jobs submition to the test cloud site
 +
during EGI TF demo.
 +
 
===2.2. Plans===
 
===2.2. Plans===
 
VO auger: continue in evaluation of parameter changes on the production efficiency,
 
VO auger: continue in evaluation of parameter changes on the production efficiency,

Revision as of 10:30, 2 November 2012



Quarterly Report Number NGI Name Partner Name Author


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. User Support achievements

VO auger: Continuous bulk production. First discussions about possible use of the DIRAC as a file catalogue and possible also production system. Tests of file transfers to a new SE associated with the Prague site but located in Pilsen (aka distributed Tier2). Demonstration of jobs submition to the test cloud site during EGI TF demo.

2.2. Plans

VO auger: continue in evaluation of parameter changes on the production efficiency, test DIRAC file cataloque as a possible substitution for the LFC, clean the LFC from obsolete entries (if tools available and well tested), test FTS transfers from and to more sites. LHC VOs atlas and alice: continue with large scale production and analysis on praguelcg2 site, gradually decrease space allocated in the GROUPDISK and reallocate it to DATADISK, participate (at least remotely) in the Tier1,2,3 jamboree, follow recommendations of the DPM Community workshop, support local users VO belle: General support on the site, preparation of accounting reports for local Belle representatives

2.3. Issues and mitigation

Issue Description Mitigation Description