Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Czech Rep-US-QR10"

From EGIWiki
Jump to navigation Jump to search
 
(15 intermediate revisions by 2 users not shown)
Line 1: Line 1:
[[Category:NGI QR Reports]]


{{Template:EGI-Inspire menubar}}
{{Template:Inspire_reports_menubar}}
{{TOC_right}}
<!-- VERY IMPORTANT
<!-- VERY IMPORTANT
This report covers support activities to existing user communities, and belongs to EGI-InSPIRE SA1 (Task SA1.7 - Support Teams). The outreach to new communities activities that NGIs perform under NA2 are gathered through the Virtual Teams. However, there may be outreach activities that do outside of VTs. You can report about these in your 2.2.3 paragraph as well.
This report covers support activities to existing user communities, and belongs to EGI-InSPIRE SA1 (Task SA1.7 - Support Teams). The outreach to new communities activities that NGIs perform under NA2 are gathered through the Virtual Teams. However, there may be outreach activities that do outside of VTs. You can report about these in your 2.2.3 paragraph as well.
Line 44: Line 47:
!scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL)  
!scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL)  
|-
|-
|
||17.-22.9.||Prague||EGI TF 2012||400
|
|
|
|
Line 51: Line 54:
|-
|-
|}
|}


===1.3. PUBLICATIONS===
===1.3. PUBLICATIONS===
Line 66: Line 68:


===2.1. User Support achievements===
===2.1. User Support achievements===
VO auger:
During PQ10 NGI_CZ user support activities for new and current communities focused on the following main areas:
Continuous bulk production.  
 
First discussions about possible use of the DIRAC as a file catalogue
* continuous bulk production and user support in VO auger, atlas, alice, voce, metacentrum,...
and possible also production system. Tests of file transfers to a new
** VO voce: the improvement of the available documentation for local users
SE associated with the Prague site but located in Pilsen (aka  
** VO metacentrum: improvement of documentation, installation of new application software accessible via local grid only (therefore not involved in EGI application database)
distributed Tier2). Demonstration of jobs submition to the test cloud site
** VO auger: First discussions about possible use of the DIRAC as a file catalog and possible also production system. Tests of file transfers to a new SE associated with the Prague site but located in Pilsen (aka distributed Tier2). Demonstration of jobs submition to the test cloud site during EGI TF demo.
during EGI TF demo.
 
* We gained 50+ new users from various academic institutions (Academy of Sciences of the Czech Republic and Universities) in PQ10
 
* EGI TF 2012 organisation and participation
 
* Participation in 2 EGI VTs (reported separately)
 
* Communication with people from ELIXIR_CZ node resulted to VT ELIXIR proposal (VT now participate more than 20 people from 12 countries, reported separately)


===2.2. Plans===
===2.2. Plans===
VO auger: continue in evaluation of parameter changes on the production efficiency,
* VO auger: continue in evaluation of parameter changes on the production efficiency, test DIRAC file cataloque as a possible substitution for the LFC, clean the LFC from obsolete entries (if tools available and well tested), test FTS transfers from and to more sites.
test DIRAC file cataloque as a possible substitution for the LFC, clean the LFC from
 
obsolete entries (if tools available and well tested), test FTS transfers from and to
* VOs atlas and alice: continue with large scale production and analysis on praguelcg2 site, gradually decrease space allocated in the GROUPDISK and reallocate it to DATADISK, participate (at least remotely) in the Tier1,2,3 jamboree, follow recommendations of the DPM Community workshop, support local users
more sites.
 
LHC VOs atlas and alice: continue with large scale production and analysis on praguelcg2  
* VO belle: General support on the site, preparation of accounting reports for local Belle representatives
site, gradually decrease space allocated in the GROUPDISK and reallocate it to DATADISK,
 
participate (at least remotely) in the Tier1,2,3 jamboree, follow recommendations of the
* Planed dissemination:
DPM Community workshop, support local users
** presentation on PRACE workshop in IT4I Ostrava (6.11.), Czech Republic
VO belle: General support on the site, preparation of accounting reports for local Belle  
** 2 workshops in 2 academic institutions (mid of November), Czech Republic
representatives


===2.3. Issues and mitigation===
===2.3. Issues and mitigation===

Latest revision as of 10:27, 23 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports




Quarterly Report Number NGI Name Partner Name Author


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
17.-22.9. Prague EGI TF 2012 400

1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. User Support achievements

During PQ10 NGI_CZ user support activities for new and current communities focused on the following main areas:

  • continuous bulk production and user support in VO auger, atlas, alice, voce, metacentrum,...
    • VO voce: the improvement of the available documentation for local users
    • VO metacentrum: improvement of documentation, installation of new application software accessible via local grid only (therefore not involved in EGI application database)
    • VO auger: First discussions about possible use of the DIRAC as a file catalog and possible also production system. Tests of file transfers to a new SE associated with the Prague site but located in Pilsen (aka distributed Tier2). Demonstration of jobs submition to the test cloud site during EGI TF demo.
  • We gained 50+ new users from various academic institutions (Academy of Sciences of the Czech Republic and Universities) in PQ10
  • EGI TF 2012 organisation and participation
  • Participation in 2 EGI VTs (reported separately)
  • Communication with people from ELIXIR_CZ node resulted to VT ELIXIR proposal (VT now participate more than 20 people from 12 countries, reported separately)

2.2. Plans

  • VO auger: continue in evaluation of parameter changes on the production efficiency, test DIRAC file cataloque as a possible substitution for the LFC, clean the LFC from obsolete entries (if tools available and well tested), test FTS transfers from and to more sites.
  • VOs atlas and alice: continue with large scale production and analysis on praguelcg2 site, gradually decrease space allocated in the GROUPDISK and reallocate it to DATADISK, participate (at least remotely) in the Tier1,2,3 jamboree, follow recommendations of the DPM Community workshop, support local users
  • VO belle: General support on the site, preparation of accounting reports for local Belle representatives
  • Planed dissemination:
    • presentation on PRACE workshop in IT4I Ostrava (6.11.), Czech Republic
    • 2 workshops in 2 academic institutions (mid of November), Czech Republic

2.3. Issues and mitigation

Issue Description Mitigation Description