Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Czech Rep-QR9"

From EGIWiki
Jump to navigation Jump to search
 
(2 intermediate revisions by 2 users not shown)
Line 1: Line 1:
__NOTOC__
{{Template:EGI-Inspire menubar}}
 
{{Template:Inspire_reports_menubar}}
{{TOC_right}}
{| border="1" cellspacing="0" cellpadding="2"
{| border="1" cellspacing="0" cellpadding="2"
|-
|-
Line 86: Line 89:
We have implemented monitoring of two local VOs - VOCE and MPI into the NGI Nagios
We have implemented monitoring of two local VOs - VOCE and MPI into the NGI Nagios


Auger Tutorial organised in Prague, XX participants.
Auger Tutorial organised in Prague, with 36 participants.


===2.3. Issues and mitigation===
===2.3. Issues and mitigation===

Latest revision as of 18:19, 9 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



Quarterly Report Number NGI Name Partner Name Author
9 NGI_CZ CESNET Miroslav Ruda


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
24.-26.6. Prague Auger Software Tutorial 36 https://indico.nucleares.unam.mx/conferenceDisplay.py?confId=641

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
21-25 May New York, USA Computing in High Energy Physics 2012 1 http://indico.cern.ch/conferenceDisplay.py?confId=149557

We participated with a poster "IPv6 testing and deployment at Prague Tier 2"

16-20.7. Dubna GRID 2012 2 http://grid2012.jinr.ru/programme.php, We participated with a talk "Prague TIER-2 operations"


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

Regular maintenance of national services (BDII, Nagios, Regional dashboard), services provided for Auger and VOCE VOs (WMS+LB, UI, MyProxy, VOMS). We participated in the activities of the EGI CSIRT team on daily basis, including watching current threats and following up with sites exposing potential vulnerabilities in the Czech NGI. As part of the security monitoring activity activity of CSIRT we collaborated with the security dashboard developers on introducing metrics to the dashboard.

2.2. Main Achievements

Majority of core services (WMS, LB, MyProxy etc.) updated to UMD version of middleware.

We have implemented monitoring of two local VOs - VOCE and MPI into the NGI Nagios

Auger Tutorial organised in Prague, with 36 participants.

2.3. Issues and mitigation

Issue Description Mitigation Description
DPM update resulted in 2 days lost capacity of the praguelcg2 site for ATLAS and Auger. The "known issue" bug solution provided via GGUS only next day after several other hypotheses checked.
LFC for the VO auger suffers by a slow response of from the MySQL server, sometimes queries time out. We plan to move the MySQL server to a new hardware and create separated instance only for the cataloque.
Continuous problems with local Operations Portal instance Upgrade to the latest version, recommended by developers,

but it raised another set of problems.