Difference between revisions of "EGI-InSPIRE:Czech Rep-QR9"
Jump to navigation
Jump to search
(Created page with "__NOTOC__ {| border="1" cellspacing="0" cellpadding="2" |- !scope="col"| Quarterly Report Number !scope="col"| NGI Name !scope="col"| Partner Name !scope="col"| Author |- | | | ...") |
|||
Line 7: | Line 7: | ||
!scope="col"| Author | !scope="col"| Author | ||
|- | |- | ||
| | |9 | ||
| | |NGI_CZ | ||
| | |CESNET | ||
| | |Miroslav Ruda | ||
|- | |- | ||
|} | |} | ||
Line 36: | Line 36: | ||
!scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL) | !scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL) | ||
|- | |- | ||
| | |24.-26.6. || Prague || Auger Software Tutorial || 36 | https://indico.nucleares.unam.mx/conferenceDisplay.py?confId=641 | ||
| | |||
| | |||
| | |||
| | |||
|- | |- | ||
|} | |} | ||
Line 51: | Line 47: | ||
!scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL) | !scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL) | ||
|- | |- | ||
||||||||| | | 21-25 May || New York, USA || Computing in High Energy Physics 2012 || 1 || http://indico.cern.ch/conferenceDisplay.py?confId=149557 | ||
We participated with a poster "IPv6 testing and deployment at Prague Tier 2" | |||
|- | |||
| 16-20.7. || Dubna || GRID 2012 || 2 || http://grid2012.jinr.ru/programme.php, We participated with a talk "Prague TIER-2 operations" | |||
|- | |- | ||
|} | |} | ||
Line 74: | Line 73: | ||
===2.1. Progress Summary=== | ===2.1. Progress Summary=== | ||
Regular maintenance of national services (BDII, Nagios, Regional dashboard), services provided for Auger and VOCE VOs (WMS+LB, UI, MyProxy, VOMS). | |||
We participated in the activities of the EGI CSIRT team on daily basis, | |||
including watching current threats and following up with sites exposing | |||
potential vulnerabilities in the Czech NGI. As part of the security | |||
monitoring activity activity of CSIRT we collaborated with the security | |||
dashboard developers on introducing metrics to the dashboard. | |||
===2.2. Main Achievements=== | ===2.2. Main Achievements=== | ||
Majority of core services (WMS, LB, MyProxy etc.) updated to UMD version of middleware. | |||
We have implemented monitoring of two local VOs - VOCE and MPI into the NGI Nagios | |||
===2.3. Issues and mitigation=== | ===2.3. Issues and mitigation=== | ||
Line 89: | Line 98: | ||
Please, fill the table below. You can add a line copyng the two lines | Please, fill the table below. You can add a line copyng the two lines | ||
|- | |- | ||
| Issue | | Praguelcg2 investigates poor network performance between its network and | ||
T1 centres. Guaranteed capacity is required for participation in Tier2D | |||
project. || Issue mitigation | |||
|- | |||
| DPM update resulted in 2 days lost capacity of the praguelcg2 site for ATLAS and Auger. || The "known issue" bug solution provided via GGUS only next day after several other hypotheses checked. | |||
|- | |||
| LFC for the VO auger suffers by a slow response of from the MySQL server, sometimes queries time out. || We plan to move the MySQL server to a new hardware and create separated instance only for the cataloque. | |||
|- | |||
continuous problems with local Operations Portal instance | |||
mitigation - upgrade to the latest version, recommended by developers, | |||
but it raised another set of problems | |||
|- | |||
--> | --> |
Revision as of 10:36, 31 July 2012
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
9 | NGI_CZ | CESNET | Miroslav Ruda |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
24.-26.6. | Prague | Auger Software Tutorial | https://indico.nucleares.unam.mx/conferenceDisplay.py?confId=641 |
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
21-25 May | New York, USA | Computing in High Energy Physics 2012 | 1 | http://indico.cern.ch/conferenceDisplay.py?confId=149557
We participated with a poster "IPv6 testing and deployment at Prague Tier 2" |
16-20.7. | Dubna | GRID 2012 | 2 | http://grid2012.jinr.ru/programme.php, We participated with a talk "Prague TIER-2 operations" |
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
Regular maintenance of national services (BDII, Nagios, Regional dashboard), services provided for Auger and VOCE VOs (WMS+LB, UI, MyProxy, VOMS). We participated in the activities of the EGI CSIRT team on daily basis, including watching current threats and following up with sites exposing potential vulnerabilities in the Czech NGI. As part of the security monitoring activity activity of CSIRT we collaborated with the security dashboard developers on introducing metrics to the dashboard.
2.2. Main Achievements
Majority of core services (WMS, LB, MyProxy etc.) updated to UMD version of middleware.
We have implemented monitoring of two local VOs - VOCE and MPI into the NGI Nagios
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|