Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

EGI-InSPIRE:Czech Rep-QR5

From EGIWiki
Revision as of 15:24, 28 July 2011 by Ruda (talk | contribs)
Jump to navigation Jump to search
Quarterly Report Number NGI Name Partner Name Author
5 NGI_CZ Cesnet Miroslav Ruda


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
11.-13. May 2011 Prague 22nd EUGridPMA Meeting 1 http://www.eugridpma.org/meetings/2011-05/

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
2.-6. May 2011 Darmstadt/Germany HEPIX 2 http://indico.cern.ch/contributionDisplay.py?contribId=54&sessionId=6&confId=118192


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

prague_lcg2:

  • New central SQL server installed and used for critical loaded services (DPM head node and CREAM CE).
  • The rest (1/6 of the total capacity) of the new disk arrays has been put into production (total capacity of this procurement is 972TB)
  • The site participated in SSC5 and tested cooperation with national CSIRT.

prague_cesnet_lcg2:

  • Regular updates applied for the NGI_CZ critical infrastructure (Top BDII, UI, WMS, LB, Nagios).
  • Testing nagios integration with other NGI nagioses (for central surveillance of EGI and non EGI national services).
  • Regular updates of Czech instance of operations portal. - New CREAM CE installed for prague_cesnet_lcg2

Security

  • Regular activities of EGI CSIRT members performed, including weekly and monthly EVO meetings. We followed up the issues that emerged (Torque
    vulnerabilities, security breaches at EGI sites).
  • Coordination of Security challenge in which one site of our NGI was involved.
  • Participation in discussions about extensions of the operations portal with security features and collaborated on its integration with the EGI
    SSO system. A pilot version of the security dashboard has been made available and we're going to coordinate its evaluation in the EGI CSIRT.
  • Support and devolopment of the Pakiti system to monitor patching status. We produced tools and guides to perform ad-hoc
    monitoring, which was used to verify a site that exposed security issues

2.2. Main Achievements

  • All NGI_CZ sites have more than 90% in availability and reliability.

2.3. Issues and mitigation

Issue Description Mitigation Description