Difference between revisions of "EGI-InSPIRE:Czech Rep-QR5"
Jump to navigation
Jump to search
Line 69: | Line 69: | ||
<!--''Note: just report activities relevant to this Quarter.''--> | <!--''Note: just report activities relevant to this Quarter.''--> | ||
===2.1. Progress Summary=== | === 2.1. Progress Summary === | ||
'''prague_lcg2''': | |||
*New central SQL server installed and used for critical loaded services (DPM head node and CREAM CE). | |||
*The rest (1/6 of the total capacity) of the new disk arrays has been put into production (total capacity of this procurement is 972TB) | |||
*The site participated in SSC5 and tested cooperation with national CSIRT. | |||
'''prague_cesnet_lcg2:''' | |||
*Regular updates applied for the NGI_CZ critical infrastructure (Top BDII, UI, WMS, LB, Nagios). | |||
*Testing nagios integration with other NGI nagioses (for central surveillance of EGI and non EGI national services). | |||
*Regular updates of Czech instance of operations portal. - New CREAM CE installed for prague_cesnet_lcg2 | |||
===2.2. Main Achievements=== | ===2.2. Main Achievements=== | ||
Revision as of 16:19, 28 July 2011
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
5 | NGI_CZ | Cesnet | Miroslav Ruda |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
11.-13. May 2011 | Prague | 22nd EUGridPMA Meeting | 1 | http://www.eugridpma.org/meetings/2011-05/ |
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
2.-6. May 2011 | Darmstadt/Germany | HEPIX | 2 | http://indico.cern.ch/contributionDisplay.py?contribId=54&sessionId=6&confId=118192 |
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
prague_lcg2:
- New central SQL server installed and used for critical loaded services (DPM head node and CREAM CE).
- The rest (1/6 of the total capacity) of the new disk arrays has been put into production (total capacity of this procurement is 972TB)
- The site participated in SSC5 and tested cooperation with national CSIRT.
prague_cesnet_lcg2:
- Regular updates applied for the NGI_CZ critical infrastructure (Top BDII, UI, WMS, LB, Nagios).
- Testing nagios integration with other NGI nagioses (for central surveillance of EGI and non EGI national services).
- Regular updates of Czech instance of operations portal. - New CREAM CE installed for prague_cesnet_lcg2
2.2. Main Achievements
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|