===2.2. Main Achievements=== | ===2.2. Main Achievements=== | ||
* gLite 3.2 migration almost done, MON box upgrade was delayed with CA change, the only missing service is LCG-CE | * gLite 3.2 migration almost done, MON box upgrade was delayed with CA change, the only missing service is LCG-CE | ||
* Installation of new worker nodes adding about 4600 HEPSpec performance to cluster praguelcg. Installation of new DPM disk servers that should provide about 1PB disk | * Installation of new worker nodes adding about 4600 HEPSpec performance to cluster praguelcg. Installation of new DPM disk servers that should provide about 1PB disk space. This space is not in production yet. The servers are still under performance and burn-in tests. | ||
space. This space is not in production yet. The servers are still under performance and burn-in tests. | |||
===2.3. Issues and mitigation=== | ===2.3. Issues and mitigation=== |
Revision as of 00:12, 9 February 2011
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
3 | NGI_CZ | Czech Republic | Miroslav Ruda |
1. MEETINGS AND DISSEMINATION
GENERAL GUIDELINES FOR ALL EVENTS REPORTED IN THE FOLLOWING SECTIONS:
- please do not provide a list of participants, only give the number of people that attended
- for outcome, please list tangible agreements, decisions instead of listing program points or presentations you made. Otherwise put: “-“
- include your local events only if there was any EGI-related topic on the agenda
- provide an indico URL to your presentation (if available) or to the event itself.
- If your presentation is not available online, please send the slides to erika.swiderski@egi.eu.
Note: Complete the tables below by adding as many rows as needed. Note: Complete the tables below by adding as many rows as needed.
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
22.-24. November 2010 | Prague | EMI All Hands Meeting | 1 | http://indico.cern.ch/conferenceDisplay.py?confId=108375 |
24.-25. January 2011 | Amsterdam | Operations Management Board | 1 | https://www.egi.eu/indico/conferenceDisplay.py?confId=153 |
Cern|ATLAS computing week|1|- |
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
- National instances of Nagios, Top BDII and Operations portal were provided, as well as set of services provided for VOCE and Auger VOs (WMS, LB, UI, MyProxy, VOMS).
- APEL accounting service was successfully deployed on Cesnet cluster, complete migration to APEL will be finished in February.
- Migration to glite 3.2 was done on almost all services, the only missing services are LCG-CE (still missing in glite 3.2) and MON box.
- Migration to new certification authority CESNET CA3 has started, most of services are already running with service certificate signed by new CA
- We have been further maintaining the RequestTracker ticketing system (RT) and the interface between RT and the GGUS. NGI_CZ is also actively participating in the GGUS-RT Interface Task Force. In the last reporting period we had to deal with issues stemming from unrehearsed and impromptu interconnecting of different NGI ticketing systems and mailing lists and take measures to prevent these issues in the future.
- As the coordinator of the security monitoring activity of EGI CSIRT, we produced a draft of functions of security dashboard and initiated discussions with the portal developers and OTAG about enhancing the current operations dashboard accordingly. A final decision about the implmentation has been than taken by OTAG and the work has started. A first prototype of the security dashboard is planned for cca May 2011.
- We've applied additional improvements to the EGI Pakiti service, which detects unpatched machines in the infrastructure (namely an alerting mechanism was added, which sents out notifications whenever a critical vulnerability appears).
- Regular activities in the EGI CSIRT, we acted a duty-contact for one week.
2.2. Main Achievements
- gLite 3.2 migration almost done, MON box upgrade was delayed with CA change, the only missing service is LCG-CE
- Installation of new worker nodes adding about 4600 HEPSpec performance to cluster praguelcg. Installation of new DPM disk servers that should provide about 1PB disk space. This space is not in production yet. The servers are still under performance and burn-in tests.
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|---|
Bad availability/reliability numbers for prague_cesnet_lcg2 cluster in December | Problem was invoked by SAM org.sam.WN-Rep group, which is failing irregularly. Problem is detected only by SAM test, productions runs are not affected. We are investigating this issue, more in is in GGUS ticket https://gus.fzk.de/ws/ticket_info.php?ticket=66107 |