Difference between revisions of "EGI-InSPIRE:BosniaH-QR3"
(Created page with '__NOTOC__ {| border="1" cellspacing="0" cellpadding="2" |- !scope="col"| Quarterly Report Number !scope="col"| NGI Name !scope="col"| Partner Name !scope="col"| Author |- |<Num…') |
|||
(6 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{Template:EGI-Inspire menubar}} | |||
{{Template:Inspire_reports_menubar}} | |||
{{TOC_right}} | |||
{| border="1" cellspacing="0" cellpadding="2" | {| border="1" cellspacing="0" cellpadding="2" | ||
Line 8: | Line 12: | ||
!scope="col"| Author | !scope="col"| Author | ||
|- | |- | ||
| | |3 | ||
| | |NGI_BA | ||
| | |Bosnia and Herzegovina | ||
| | |Mihajlo Savic | ||
|- | |- | ||
|} | |} | ||
Line 20: | Line 24: | ||
==1. MEETINGS AND DISSEMINATION == | ==1. MEETINGS AND DISSEMINATION == | ||
<!-- | |||
=====GENERAL GUIDELINES FOR ALL EVENTS REPORTED IN THE FOLLOWING SECTIONS:===== | |||
*please do not provide a list of participants, only give the number of people that attended | |||
*for outcome, please list tangible agreements, decisions instead of listing program points or presentations you made. Otherwise put: “-“ | |||
*include your local events only if there was any EGI-related topic on the agenda | |||
*provide an indico URL to your presentation (if available) or to the event itself. | |||
**If your presentation is not available online, please send the slides to erika.swiderski@egi.eu. | |||
Note: Complete the tables below by adding as many rows as needed. | Note: Complete the tables below by adding as many rows as needed. | ||
Note: Complete the tables below by adding as many rows as needed. --> | |||
===1.1. CONFERENCES/WORKSHOPS ORGANISED=== | ===1.1. CONFERENCES/WORKSHOPS ORGANISED=== | ||
Line 30: | Line 42: | ||
!scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL) | !scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL) | ||
|- | |- | ||
<!-- formatting_test --> | <!-- formatting_test --> | ||
|- | |- | ||
Line 46: | Line 53: | ||
!scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL) | !scope="col"|Date||Location||Title||Participants||Outcome (Short report & Indico URL) | ||
|- | |- | ||
| | |26.01.2010.||Sarajevo||South East European Research Area for eInfrastructures Open Day||M. Savic||Agreement with Ministry of Communication and Trasport representatives to provide support to NGI members from Sarajevo in solving infrastructure issues. | ||
|- | |- | ||
<!-- formatting text --> | <!-- formatting text --> | ||
|- | |- | ||
Line 68: | Line 72: | ||
!scope="col"|Publication title||Journal / Proceedings title||align="left" |Journal references<br> ''Volume number<br> Issue<br><br>Pages from - to''||align="left" |Authors ''<br>1.<br>2.<br>3.<br>Et al?'' | !scope="col"|Publication title||Journal / Proceedings title||align="left" |Journal references<br> ''Volume number<br> Issue<br><br>Pages from - to''||align="left" |Authors ''<br>1.<br>2.<br>3.<br>Et al?'' | ||
|- | |- | ||
| | |INDEL 2010 Proceedings||Proceedings||Vol:7<br>Issue:1<br>Pg: 300 - 304||1.M. Savic<br>2.M. Bozic<br> | ||
|} | |} | ||
Line 80: | Line 80: | ||
===2.1. Progress Summary=== | ===2.1. Progress Summary=== | ||
<!-- Provide your test below --> | <!-- Provide your test below --> | ||
NGI_BA infrastructure and operations adapted to be independent from SEE ROC and their provided central services. Transition to fully operational NGI finished in January due to the holiday season mismatch between countries. | |||
No serious infrastructure problems detected in this quarter in certified sites. Issues with flaky networking in one site prevented it from being certified. | |||
Work on NGI infrastructure transition delayed addition of one site (BA-03-ETFSA) to EGI infrastructure. Plans adjusted to this quarter. | |||
Regarding the transition away from gLite-3.1, the decision was made to wait for official roll-out of EMI release. Due to the requirements of EMI some of the equipment will have to be replaced and/or upgraded. | |||
===2.2. Main Achievements=== | ===2.2. Main Achievements=== | ||
Line 85: | Line 92: | ||
Provide your text below | Provide your text below | ||
--> | --> | ||
Establishing NGI_BA as fully operational NGI within EGI with all the needed core NGI services verified. | |||
===2.3. Issues and mitigation=== | ===2.3. Issues and mitigation=== | ||
Line 93: | Line 102: | ||
!scope="col"| Mitigation Description | !scope="col"| Mitigation Description | ||
|- | |- | ||
|- | |- | ||
|} | |} |
Latest revision as of 16:41, 6 January 2015
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
3 | NGI_BA | Bosnia and Herzegovina | Mihajlo Savic |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
26.01.2010. | Sarajevo | South East European Research Area for eInfrastructures Open Day | M. Savic | Agreement with Ministry of Communication and Trasport representatives to provide support to NGI members from Sarajevo in solving infrastructure issues. |
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|---|---|---|
INDEL 2010 Proceedings | Proceedings | Vol:7 Issue:1 Pg: 300 - 304 |
1.M. Savic 2.M. Bozic |
2. ACTIVITY REPORT
2.1. Progress Summary
NGI_BA infrastructure and operations adapted to be independent from SEE ROC and their provided central services. Transition to fully operational NGI finished in January due to the holiday season mismatch between countries.
No serious infrastructure problems detected in this quarter in certified sites. Issues with flaky networking in one site prevented it from being certified.
Work on NGI infrastructure transition delayed addition of one site (BA-03-ETFSA) to EGI infrastructure. Plans adjusted to this quarter.
Regarding the transition away from gLite-3.1, the decision was made to wait for official roll-out of EMI release. Due to the requirements of EMI some of the equipment will have to be replaced and/or upgraded.
2.2. Main Achievements
Establishing NGI_BA as fully operational NGI within EGI with all the needed core NGI services verified.
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|