Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Bosnia-QR11"

From EGIWiki
Jump to navigation Jump to search
 
(2 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Template:Op menubar}} {{Template:Inspire_reports_menubar}} {{TOC_right}}  
{{Template:EGI-Inspire menubar}}
{{Template:Inspire_reports_menubar}} {{TOC_right}}  


<br>  
<br>  
Line 34: Line 35:
! Outcome (Short report &amp; Indico URL)
! Outcome (Short report &amp; Indico URL)
|-
|-
| 15th/22nd January 2013
| December 2012 / January 2013
| Faculty of Electrical Engineering Banja Luka
| Faculty of Electrical Engineering Banja Luka
| Introduction to grid computing and parallel programming
| Introduction to grid computing and parallel programming
Line 129: Line 130:
|-
|-
| Issue Description || Issue mitigation
| Issue Description || Issue mitigation
-->  
-->
 
[[Category:NGI_QR_Reports]]

Latest revision as of 15:41, 6 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports




Quarterly Report Number NGI Name Partner Name Author
<Number of Quarterly report> <NGI Name> <NGI Country> <Name of person submitting the QR>


1. MEETINGS AND DISSEMINATION

Note: Complete the tables below by adding as many rows as needed.

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
December 2012 / January 2013 Faculty of Electrical Engineering Banja Luka Introduction to grid computing and parallel programming 35 The lectures were given for 35 students of 3rd year of CS/CE course of ETFBL

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
<Date> <Location> Title Participants Outcome
<Date> <Location> Title Participants Outcome
<Date> <Location> Title Participants Outcome Test


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?
<Publication title> <Journal/Proceedings> Vol:<volume number>
Issue:<Issue>
Pg: <from> - <to>
1.<Author 1>
2.<Author2>
3. <Author3>
<Publication title> <Journal/Proceedings> Vol:<volume number>
Issue:<Issue>
Pg: <from> - <to>
1.<Author 1>
2.<Author2>
3. <Author3>
<Publication title> <Journal/Proceedings> Vol:<volume number>
Issue:<Issue>
Pg: <from> - <to>
1.<Author 1>
2.<Author2>
3. <Author3>

2. ACTIVITY REPORT

2.1. Progress Summary

NGI functioning with no issues. All core services now running in virtualized environment.

2.2. Main Achievements

Migration of all core services to virtualized environment performed with no issues. We are using KVM and OpenVZ for virtualization (KVM for core services and WNs, investigating use of OpenVZ for WNs). Currently testing 3 worker nodes in virtualized environment (WN VM is running as sole VM on each server) and measuring performance degradation.

2.3. Issues and mitigation

Issue Description Mitigation Description
Issue description Issue mitigation