Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Amb 2014-03-26"

From EGIWiki
Jump to navigation Jump to search
 
(9 intermediate revisions by 7 users not shown)
Line 1: Line 1:
{{TOC_right}}
{{EGI-Inspire_menubar}}
{{TOC_right}}  


[[Activity_Management_Board#From_October_2013| Back]] to the AMB wiki home page
[[Activity_Management_Board#From_October_2013| Back]] to the AMB wiki home page
Line 14: Line 15:
<!-- Neasan -->
<!-- Neasan -->
<!-- # News Items/Articles -->
<!-- # News Items/Articles -->
# Media Mentions
<!-- # Media Mentions -->
#* EGI-related image used as [http://www.isgtw.org/visualization/glimpsing-galaxies-grid-computing the visual in this week's iSGTW]
<!-- # Events -->
<!-- # Events -->
<!-- # Human Networks -->
<!-- # Human Networks -->
Line 40: Line 40:
** Update collaboration tables
** Update collaboration tables
** Support Genome Analysis and Protein Sequence
** Support Genome Analysis and Protein Sequence
** VT plan for a LifeWatch collaboration
** VT initial plan for a LifeWatch collaboration
** Input for EMSO/EGI meeting minutes
** Input for EMSO/EGI meeting minutes
* Federated Cloud
* Federated Cloud
Line 52: Line 52:
*User facing issues in information gathering about EGI
*User facing issues in information gathering about EGI
**compiled summary with typical questions from users and the EGI web tools providing the answers including issues.
**compiled summary with typical questions from users and the EGI web tools providing the answers including issues.
* Preparation for User Introduction Training @ EGI CF - call for trainers
* Scientific use cases - further confirmations received. Only 1 more to go...
* Director level contact to Euro-BioImaging and BBMRI
* DRIHM collaboration telcon (notes to be available on the agenda soon)
* Arrange telcon with French Galaxy hackathon team from EGI CF
* Cloud tutorial - 'smallish' changes implemented
* Start working on the BioMedBridges e-infrastructure awareness raising workshop with EBI


=== ER-flow  ===
=== ER-flow  ===
Line 58: Line 65:
*getting-started and platform pages for ER-flow website
*getting-started and platform pages for ER-flow website
**blocking issues: DCI field is not defined
**blocking issues: DCI field is not defined
*Adding biobankcloud project details to the ER-flow wiki
*Adding biobankcloud project details to the ER-flow wiki (projects to target)
*No new suitable events for ER-flow found
*No new suitable events for ER-flow found


=== BioVeL  ===
=== BioVeL  ===


* ST weekly meeting
* ST weekly meeting: stress test DRW and ENM
** stress test DRW and ENM
* Assess OpenModeller & BioSTIF WS status
* Assess OpenModeller & BioSTIF WS status
** coordinate next ENM WF stress test with EGI end-points
** Coordinate next ENM WF stress test with EGI end-points
 
* Monitoring activity
 
** Coordinate LifeWatch/BioVeL WS endorsement and VO affiliation


=== Major Events Planned  ===
=== Major Events Planned  ===
Line 74: Line 80:
== SA1 ==  
== SA1 ==  
<!-- Malgorzata -->
<!-- Malgorzata -->
 
https://wiki.egi.eu/wiki/Inspire_sa1_2014-03-25


== SA2 ==  
== SA2 ==  
Line 86: Line 92:


==== TSA4.3 - Liferay ====
==== TSA4.3 - Liferay ====
 
* All evaluations and tests are completed, and the final review report is being compiled.
* Contributions to D8.1 are underway.


====TSA4.4 - OCCI for CMF====
====TSA4.4 - OCCI for CMF====
=====Progress=====
* Administrative tasks
* contribution for the first draft of D8.1
===== rOCCI-server=====
* bug fixes, released beta.3 & beta.4
* polishing the first stable release
===== ToDo for next week=====
* release stable rOCCI-server v1.0.0
===== Problems=====
* none
===== Delays=====
* no further delay


====TSA4.5 - CDMI in CMF====
====TSA4.5 - CDMI in CMF====


====TSA4.6 - OCCI CompClouds====
====TSA4.6 - OCCI CompClouds====


====TSA4.7 - AppDeployment====
====TSA4.7 - AppDeployment====
=====Progress=====
- Research on how to create VM images
- Discovered bug on front-end that allowed stealing user proxies, provide a fix.
=====Plans for next week=====
- Start reaching other communities is still pending.


====TSA4.8 - CloudCapabilities====
====TSA4.8 - CloudCapabilities====
=====Progress=====
* Investigating issues with Peachnote access to object store.
* Testing CESNET Deb 7 image contextualization with OpenStack.
* Contributing to report D8.1
=====Plans for next week=====
* Tutorial preparation for CF14


====TSA4.9 - VAPOR====
====TSA4.9 - VAPOR====
Project is due to end on 15th of April. As already mentioned previously, the user community features (users database, user's life cycle management) will not be started by the end of the project this time.
===== Progress =====
* Enable support of VOs vo.france-grilles.fr
* Development of the dark data and lost files handling is still not completed:
** Continued improvement of errors reporting
** Discuss bugs in GFAL2 API with developers
** Complete upgrade to support the gsiftp access protocol instead of srm
* Apply a list of safety recommendations to the configuration of the web server at I3S
=====Plans for next period=====
* Complete the dark data and lost files management and start using it in production for biomed (Same as in last period)
* JobMonitor: add the ability to see job errors
=====Problems we encounter, but can solve=====
none.
=====Problems and issues we need external help with=====
None.


====TSA4.10 - CompReports====
====TSA4.10 - CompReports====


====TSA4.12 - AllocateFedRes====
====TSA4.12 - AllocateFedRes====
Line 106: Line 154:
== JRA1 ==  
== JRA1 ==  
<!-- Diego -->
<!-- Diego -->
Report: [[Inspire jra1 2014-03-25]]


= Participants =
= Participants =

Latest revision as of 22:00, 24 December 2014

EGI Inspire Main page



Back to the AMB wiki home page

Activity Reports

NA1

NA2

NA2.2

NA2.3 Strategic Planning and Policy Support

NA2.4 Events

NA2.5 Technical outreach

EGI-InSPIRE

  • NILs meeting
  • Engagement scoping phase
    • Coordinate next round of meetings
    • Update collaboration tables
    • Support Genome Analysis and Protein Sequence
    • VT initial plan for a LifeWatch collaboration
    • Input for EMSO/EGI meeting minutes
  • Federated Cloud
    • coordinate assessment of BSIM2 prospective use case
  • Applications Database
    • Assess new features: 'My Virtual Organizations' & SW/VA/VO/people connections
    • Bug reporting & fixes being implemented
  • Dissemination
    • Blog post: 6th International Workshop on Science Gateways, IWSG 2014
    • Call for Lightning talks for the EGI Community Forum 2014, via AppDB
  • User facing issues in information gathering about EGI
    • compiled summary with typical questions from users and the EGI web tools providing the answers including issues.
  • Preparation for User Introduction Training @ EGI CF - call for trainers
  • Scientific use cases - further confirmations received. Only 1 more to go...
  • Director level contact to Euro-BioImaging and BBMRI
  • DRIHM collaboration telcon (notes to be available on the agenda soon)
  • Arrange telcon with French Galaxy hackathon team from EGI CF
  • Cloud tutorial - 'smallish' changes implemented
  • Start working on the BioMedBridges e-infrastructure awareness raising workshop with EBI

ER-flow

  • Testing new prototype SSP with a new submission service
    • no issues found
  • getting-started and platform pages for ER-flow website
    • blocking issues: DCI field is not defined
  • Adding biobankcloud project details to the ER-flow wiki (projects to target)
  • No new suitable events for ER-flow found

BioVeL

  • ST weekly meeting: stress test DRW and ENM
  • Assess OpenModeller & BioSTIF WS status
    • Coordinate next ENM WF stress test with EGI end-points
  • Monitoring activity
    • Coordinate LifeWatch/BioVeL WS endorsement and VO affiliation

Major Events Planned

SA1

https://wiki.egi.eu/wiki/Inspire_sa1_2014-03-25

SA2

SA4

Summary

TSA4.2 - MOOC

TSA4.3 - Liferay

  • All evaluations and tests are completed, and the final review report is being compiled.
  • Contributions to D8.1 are underway.

TSA4.4 - OCCI for CMF

Progress
  • Administrative tasks
  • contribution for the first draft of D8.1
rOCCI-server
  • bug fixes, released beta.3 & beta.4
  • polishing the first stable release
ToDo for next week
  • release stable rOCCI-server v1.0.0
Problems
  • none
Delays
  • no further delay

TSA4.5 - CDMI in CMF

TSA4.6 - OCCI CompClouds

TSA4.7 - AppDeployment

Progress

- Research on how to create VM images - Discovered bug on front-end that allowed stealing user proxies, provide a fix.

Plans for next week

- Start reaching other communities is still pending.

TSA4.8 - CloudCapabilities

Progress
  • Investigating issues with Peachnote access to object store.
  • Testing CESNET Deb 7 image contextualization with OpenStack.
  • Contributing to report D8.1
Plans for next week
  • Tutorial preparation for CF14

TSA4.9 - VAPOR

Project is due to end on 15th of April. As already mentioned previously, the user community features (users database, user's life cycle management) will not be started by the end of the project this time.

Progress
  • Enable support of VOs vo.france-grilles.fr
  • Development of the dark data and lost files handling is still not completed:
    • Continued improvement of errors reporting
    • Discuss bugs in GFAL2 API with developers
    • Complete upgrade to support the gsiftp access protocol instead of srm
  • Apply a list of safety recommendations to the configuration of the web server at I3S
Plans for next period
  • Complete the dark data and lost files management and start using it in production for biomed (Same as in last period)
  • JobMonitor: add the ability to see job errors
Problems we encounter, but can solve

none.

Problems and issues we need external help with

None.

TSA4.10 - CompReports

TSA4.12 - AllocateFedRes

JRA1

Report: Inspire jra1 2014-03-25

Participants

Discussion