Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

EGI-InSPIRE:Amb 2014-01-15

From EGIWiki
Revision as of 16:20, 14 January 2014 by Scardaci (talk | contribs) (→‎JRA1)
Jump to navigation Jump to search


Back to the AMB wiki home page

Activity Reports

NA1

NA2

NA2.2

NA2.3 Events

NA2.5 Technical outreach

ER-flow

  • Refactoring tutorials section for ER-flow website.
  • Investigating EC projects for ER-flow to target: 2 new projects identified (DR THERAPAT and VP2HF) and added to the ER-flow internal wiki.
  • Finding the events for ER-flow collaborators to attend.
  • VAPOR task 1: investigation of supported VOs by ER-flow/SCI-BUS

SA1

SA2

SA4

JRA1

Report: Inspire jra1 2014-01-14

Participants

Discussion