EGI-InSPIRE:Amb 2013-12-10

From EGIWiki
Revision as of 12:54, 10 December 2013 by Ekarolis (talk | contribs) (→‎NA2.5)
Jump to navigation Jump to search

Back to the AMB wiki home page

Activity Reports

NA1

NA2

NA2.5

  • DCC wiki updates (2 new entries)
  • Gathering DCC contacts for the DCC mailing list
  • webex booking for DG VT


AppDB

ER-flow

  • refactoring tutorials section on ER-flow website

SA1

SA2

SA4 (in progress)

Summary

TSA4.1 - Management

TSA4.2 - MOOC

- Created walkthrough guide for the first three weeks: this should get new participants up and running with the VM and grid certificates. - Created recordings & quiz for week 4, this week includes the Hadoop lecture - Polishing lectures of week 5

TSA4.3 - Liferay

bi-weekly reporting

TSA4.4 - OCCI for CMF

rOCCI framework
  • updated rOCCI-api to work with the new rOCCI-core (currently in beta.5)
  • about 40 % of rOCCI-cli has already been adapted and partially rewritten to accommodate new functionality (currently in beta.3)
rOCCI-server
  • added support for creating VMs to the OpenNebula backend
  • continuously adding docs and unit tests for implemented features
ToDo for next week
  • finish up the port of the OpenNebula backend
  • implement dynamic linking features (storagelinks & networkinterfaces for running VMs)
  • in parallel, continue working on the rOCCI framework
Problems
  • None (yet :-))
Delays
  • Still approx. one month (= Florian's contribution), no further delay

TSA4.5 - CDMI in CMF

bi-weekly reporting

TSA4.6 - OCCI CompClouds

TSA4.7 - AppDeployment

Progress:

- frontend development and testing it with local phenomenology users - continue testing contextualization for verification

Plans for next week:

- development of fronted - continue testing with local users

TSA4.8 - CloudCapabilities

bi-weekly reporting

TSA4.9 - VAPOR

Progress
  • All along this period an important work has consisted in the setting up of a production-ready set of VAPOR services, that includes: fine tune logs configuration, configuration of log rotates, firewall configuration, set up of a backup procedure of the VAPOR VM
  • Bug fixing on the scan of full storage elements (sort files of expired/suspended users)
  • Investigation and fixing of a problem of high CPU consumption of the JobMonitorng tool
  • 2 days face-to-face meeting with Operations Portal team (2 and 3 of December), integration of VAPOR with the Operations Portal at the CC IN2P3 (Lyon, France)
    • Decision made on where the VAPOR data production services should be hosted, i.e. at I3S or at CC IN2P3
    • Installation of the VAPOR webapp on the web server of the CC IN2P3 and link from the Operations Portal. Now accessible for VO biomed only from: https://operations-portal.egi.eu/vapor?vo=biomed
    • Address web design and graphical homogeneity issues
    • Start migration to Lavoisier 2.1 data integration service (used as third party tool within VAPOR)
Plans for next period

Very few should now happen until the end of the month as the main developer will be on leave from Dec. 9th to 31st.

Problems we encounter, but can solve

None.

Problems and issues we need external help with

None.

TSA4.10 - CompReports

bi-weekly reporting

TSA4.12 - AllocateFedRes

JRA1

Participants

Discussion