Difference between revisions of "EGI-InSPIRE:Amb 2013-11-26"

From EGIWiki
Jump to: navigation, search
(NA2)
Line 26: Line 26:
 
== NA2 ==  
 
== NA2 ==  
 
<!-- Sergio -->
 
<!-- Sergio -->
 +
== NA2.2 ==
 +
<!-- Neasan -->
 +
# News Items/Articles
 +
#* Published news item on [http://www.egi.eu/news-and-media/newsfeed/news_2013_0054.html Domenico's appearance on the NASA stand at SC13]
 +
# Media mentions
 +
#* LOFAR news [http://www.spaceref.com/news/viewpr.html?pid=41996 picked up by SpaceRef]
 +
#* LOFAR news picked up by [http://zeenews.india.com/news/space/super-telescope-lofar-finds-two-new-pulsars_891209.html Zee News]
 +
#* Mentioned in [http://www.nettg.pl/news/115808/agh-dzien-otwarty-z-superkomputerem press release on CYFRONET open day] (in Polish)
 +
# Events
 +
#* Attended SC13 in Denver
 +
<!-- # Human Networks -->
 +
 +
# Publications
 +
#* Second batch of edits to Scientific Use Cases document done
 +
# Webinars
 +
# Other Projects
 +
#* Preparing to record voiceover for ENVRI presentation
 +
<!-- # Deliverables/Milestones -->
 +
# Staffing
 +
#* Outreach Officer and Graphic Designer started 26th of November
 +
<!-- # Other -->
  
 
== NA2.5 ==  
 
== NA2.5 ==  

Revision as of 12:31, 27 November 2013

Back to the AMB wiki home page

Activity Reports

NA1

By RMcL:

  • QR14 compilation in progress together with supporting slide set.
    • Missing slide set for SA1 and MK not due back for another week (low priority issue)
    • Annex A1 (section 7) - tables have very little input so far - all to confirm to RMcL that no further input reqd.
    • Table for all remaining milestones and deliverables compiled and dates being added. Will be sent out to all for proposals for reviewers etc.
  • H2020 Workshop - coordiantion ongoing. 112 registrations. Conf dinner no longer feasible.
    • NILs teleconference arrangements (27 Nov).
  • CF14:
    • Site visit completed. Venue will be suitable. Outstanding issue is re conduct of Technology provider/User networking afternoon "stations" but considered feasible.
    • PC14 mail list compiled.
    • INDICO page behind schedule - by end of week is best chance.
  • Webinars programme:
    • New emerging requirement from ENVRI for EGI produced voice over presentation by 2 Dec. Additional emerging requirement for total 3 of these.
  • Champions:
    • processing of TF13 and other travel claims.

NA2

NA2.2

  1. News Items/Articles
  2. Media mentions
  3. Events
    • Attended SC13 in Denver
  1. Publications
    • Second batch of edits to Scientific Use Cases document done
  2. Webinars
  3. Other Projects
    • Preparing to record voiceover for ENVRI presentation
  4. Staffing
    • Outreach Officer and Graphic Designer started 26th of November

NA2.5

  • Interpret VO, user, job metrics for QR14
  • Preparation and attend Resource Centre Forum
  • Robot user accounting - submit ticket to JRA1
  • Define user-engagement metrics for PY4 & 5
  • EISCAT_3D: Capture Proof of Concept architecture on slides, circulate to collaborators
  • Data discussion (preparation for H2020 workshop)
  • Draft 1st draft of data services position paper for H2020 workshop
  • QR14 NA2.5 summary text + summary slides
  • Prepare for NIL-Champion teleconference
  • Process responses of the NIL Outreach survey. Information about Distributed Competency Centre was made publicly visible at

ER-flow

  • Investigated 15 FP7 projects from cordis eu website and 3 most related were added as a new FP7-HEALTH projects to target by ER-flow (total amount found that could be related projects is 48)
  • Dissemination events for ER-flow (review on time basis, no new relevant events were found)

BioVeL

  • EUBON use case demo by Norman

SA1

SA2

SA4

JRA1

Report: Inspire_jra1_2013-11-26

Participants

Discussion