Difference between revisions of "EGI-Engage:WP6-PY2-Roadmap"

From EGIWiki
Jump to navigation Jump to search
Line 111: Line 111:
Davor Davidovic,&nbsp;<br>Zoltan Farkas (for D6.17)  
Davor Davidovic,&nbsp;<br>Zoltan Farkas (for D6.17)  


All members
All members  


|  
|  
Line 128: Line 128:
**Citizen Science
**Citizen Science


| Jesus Marco
| Jesus Marco  
|  
|  
|-
|-
Line 156: Line 156:
**&nbsp;These conclusions will drive work in PY3, turning the pilots into production services.
**&nbsp;These conclusions will drive work in PY3, turning the pilots into production services.


| Daniele Bailo
| Daniele Bailo  
|  
|  
|-
|-
Line 169: Line 169:
*Tsunami impact analysis in South China Sea (TW, PH)
*Tsunami impact analysis in South China Sea (TW, PH)


| <br> See in previous column
| <br> See in previous column  
| <br>
| <br>
|}
|}


[[Category:EGI-Engage]]
[[Category:EGI-Engage]]

Revision as of 10:34, 13 July 2016

EGI-Engage project: Main page WP1(NA1) WP3(JRA1) WP5(SA1) PMB Deliverables and Milestones Quality Plan Risk Plan Data Plan
Roles and
responsibilities
WP2(NA2) WP4(JRA2) WP6(SA2) AMB Software and services Metrics Project Office Procedures




This page is providing yearly activity plan for WP6 in PY2


Project month

Project Tasks

Work to be done

Goal 

(measurable)

Owner

(responsible person)

Comments
x Task 6.1, Training
  • Webinars and/of F2F events (with online user guide) about
    • ODP, DataHub (Lukasz+Diego, Matthew)
    • AAI (LIP)
    • GPGPU (Matthew+Giuseppe)
    • FedCloud API use (Giuseppe)
    • LToS (Giuseppe)
    • High-level platforms (Giuseppe, Yin-CommunityServices, Enol-CloudPlatforms/Orchestrators)
    • Security for RI managers, security user awareness (STFC, CERN, NIKHEF)
  • Continued coordination of the training infrastructure (and operation, but that's unfunded) (Gergely)
See in previous column
x Task 6.2, Tech. User Support

Priority communities:

  • Euro-Argo (ENVRIplus) (Yin)
  • ICOS (ENVRIplus) (Diego)
  • EuroBioImaging (INDIGO) (Yin)
  • ENES (INDIGO) (?)
  • EMSO (Diego)

Other communities:

  • BigDataEurope H2020 project (Enol)
  • Some VRE projects (Gergely)
  • Assess RIs from the recent ESFRI roadmap, identify 'low hanging fruits' suggest actions for engagement (Gergely)
See in previous column
x Task 6.3, ELIXIR
  • 5 scientific use case (from M6.3) are running on the EGI FedCloud & Conculsions are drawn on the use of cloud federation for ELIXIR applications (D6.15)
  • The ELIXIR Compute Platform is operated as a service for ELIXIR users, integrating cloud, AAI, monitoring, GOCDB services from EGI (underpinned by an SLA)

Kimmo Mattila

Gergely

  • x
Task 6.4, BBMRI TBD during next telco (week of 18th) CC leader
x Task 6.5, MoBrain
  • GPGPU portals (with GROMACS and AMBER) are offered as production service (D6.12)
  • Scipion (Cryo-EM) is available for cloud deployment in EGI clouds via AppDB (D6.14)
Alexandre Bonvin
  • x
Task 6.6, DARIAH
  • E-infra service portfolio for A&H established (gLibrary, SEE, CDSTAR, WS-PGRADE) (D6.17 and previous deliverables)
  • Active user base - They are engaged with at community events, Webinars, pro-active outreach

Davor Davidovic, 
Zoltan Farkas (for D6.17)

All members

x Task 6.7, LifeWatch
  • X LifeWatch applications are deployed in EGI. Application usage is monitored by...
  • Task forces:
    • MongoDB
    • GeoServer
    • R
    • Storage
    • AAI
    • Citizen Science
Jesus Marco
x Task 6.8, EISCAT_3D
  • Requirements for second portal version are collected in RT queue
  • EISCAT_3D Data Structure is defined (External activity but a dependency for the portal)
  • Second (computational) portal is in final stage of development (D6.21 in Month 28)

Ingemar


Victor Mendez

x Task 6.9, EPOS
  • 3 community pilots are implemented: AAI, Computing, Data management (Deliverable in M24)
  • Initial conclusions are drawn from the setup
    •  These conclusions will drive work in PY3, turning the pilots into production services.
Daniele Bailo
x Task 6.10, Disaster Mitigation TBC: Implementation of the following case studies (with the use of grid services):
  • Typhoon Haiyan (PH, TW)
  • Tsunami cave in Lhong-Aceh Besar (ID, TW)
  • Flooding 2014-15 (MY, TW)
  • Flooding 2008 (Nepal, TW)
  • Tsunami impact analysis in South China Sea (TW, PH)

See in previous column